Welcome Customer !

Membership

Help

Zhejiang Zhongkong Science and Education Instrument Equipment Co., Ltd
Custom manufacturer

Main Products:

instrumentb2b>Products
Product Categories

Zhejiang Zhongkong Science and Education Instrument Equipment Co., Ltd

  • E-mail

  • Phone

  • Address

    No. 309 Liuhe Road, Puyan Street, Binjiang District, Hangzhou City, Central Control Technology Park

Contact Now

Comprehensive disassembly and assembly training device for work sections

NegotiableUpdate on 05/18
Model
Nature of the Manufacturer
Producers
Product Category
Place of Origin

Overview

The comprehensive disassembly and assembly training device for the section adopts the absorption desorption process design, and sets up safety hazard identification and risk prevention and control links. It can be used for students to understand and repair chemical pipelines, fittings, valves, pumps, towers, tanks, and the use of measuring instruments and sensors. It can master the operation of safe operations such as device start stop, discharge, blowing, cleaning, replacement, blind plate plugging, and the handling of related work permits. It provides training on safety risk analysis and prevention and control capabilities, clarifies the safety operation norms and safety supervision priorities for disassembly and assembly, and conducts disassembly, inspection, and maintenance training for pipelines, fittings, valves, etc. in the section comprehensive system to enhance students' safety awareness.

Product Details

Introduction to the device

deviceadoptabsorbDesorption process flowdesignSecurity has been set uphidden dangerrecognizeIn the risk prevention and control process, it can be used forStudents gain knowledge of chemical pipelines, fittings, valves, pumps, towers, and tanksandinspection and maintenanceAnd measuring instrumentssensorMastering the usage and operation of the deviceopenParking, discharging, blowing, cleaning, replacement, blind flangeblockingWaiting for safetyhomeworkofoperationAnd relatedhomeworkHandling tickets, conducting safety risk analysis and training in prevention and control capabilities,Clear disassembly and assemblyofsafetyhomeworkspecificationandKey points of safety supervision,Conduct a comprehensive system for the production sectionMedium pipelines, fittings, valves, etcdisassembly and assemblyinspection and maintenancePractical training to enhance students' safety awareness.

Technical Specifications

Device body

longApproximately 3800 x 800 x width x height3600mm, 304 stainless steel pipeline, steel patterned plate spray painted base, switch box integrated on the object part.

Water and electricity requirements

AC380 6KW twowater ingress twodrainage