- Phone
-
Address
Liulihe Town, Fangshan District, Beijing
Beijing Chuangyu Electromechanical Equipment Co., Ltd
Liulihe Town, Fangshan District, Beijing
atLhasa and other high placesAltitude area,Fire pressurizationVoltage stabilizing equipmentComplete shipmentSpecial attention is neededThe plateau environmentSpecial requirements.Here isKey pointsAnd precautions,for yourreference resources:
1. plateauenvironmental adaptabilitydesign
Air pressure andcontainoxygen content:Lhasa altitudeAbout 3650 metersairthin, need toEnsure equipmentMotorWater pump, etcThe componentsPower andHeat dissipation performanceAdapt to lowoxygenenvironment
endurecold nature:wintertemperatureextremeLow,Equipment and materials(such asPipelineValve)Need to endureLow temperature( 20Below ℃)To avoidfreezeCrack;Lubricating oil needsselectLow temperature model.
ultravioletprotection: ShellNeed to do itUV protectionprocess(as if addingThick coatingOr stainless steelMaterial),Prevent long-termviolenceSun aging.

2.equipmentComplete shipmentlist
|component |requirement |
|--------------------|----------------------------------------------------------------------|
|firefightingwater pump |Plateau specificType,Power demandReserve 20%YuQuantity,motorinsulationLevel ≥HGrade.|
|voltage stabilizationpump|frequency conversioncontrolAdapt to trafficFluctuations,avoidFrequent activationStop. |
|atmospheric pressurecan|carbonSteel or notStainless steel material, prenitrogen fillingQi(plateauUnder atmospheric pressureNeed to adjustpre-Charging pressure).|
|controlcabinet| beltaltitudecompensation function, possessingmoisture-proofPreventiondustdesign(IP55Above).|
|Pipeline andvalve|seamlessSteel pipe orplateZinc steel pipe, flangeConnection requiredplusgasket; ValveselectcastSteel orbronzematerial|
|Attachment|pressureTablesafetyValvepressure reliefValves, etcNeed to labelplateauApplicable parameters.|
3. Transportation andInstallation precautions
transportation: Equipmentfixedprevent震,atmospheric pressureCan suggestionindividually wrapped;avoidrainy seasontransportationpreventTide preventionrust.
Installdebug:
InstallfrontCheck the sealdocumentwhetherDue to low temperaturechangeCrispy.
systemneedCarry out high-altitude activitiesUnder atmospheric pressuresealsex test(Try)Press 1.5Double workPressure).
4. after-sales servicesuggestion
provideplateauRegional ExclusiveoperationHandbook,traininglocalPersonnel.
spare partsLibrary suggestionlocated atXizangOr nearbyprovinceShorten emergency responseresponse time.
5.recommendationSupplier(example)
Xizang: XizangFire technologyCompany(Familiar with the plateauDemand).
domesticbrand: Connectedbecome、Southern PumpBusinessKaiSpring(partModel support高原定制).
if neededfurtherrefineA certain typeEquipment parametersOr process, cansupplementexplanationspecificRequirement(Like architecturetypeSystemTraffic volume/headwait).