-
E-mail
3068879847@qq.com
-
Phone
13732586353
-
Address
No.15 Shihuan Road, Dongcheng District, Dongguan City, Guangdong Province
Guangdong Kebao Experimental Equipment Co., Ltd
3068879847@qq.com
13732586353
No.15 Shihuan Road, Dongcheng District, Dongguan City, Guangdong Province
Basket type temperature shock test chamberadoptIndependently developed LCDapparentshowtouchControlled typeYingDirectly press the curtainkeyType controllerExpressed in both Chinese and EnglishimageThe vastness of formviewcorner, hightoBi Fu KetuneLarge scale backlight functionLCD liquid crystal displayapparentDisplay controller.
1. Controllerrulegrid:a. 精度:WenDegree ±0.1℃+1digit.
b. Resolution:WenDegree ±0.1.
c. Equipped with upper and lower limit standby and alarm functionsreportfunction.
d.Wen度入力信numberT-shaped
e. P.I.D controlParameter settingfixed, P. I. D frommove演算.
2..paintingnoodlesapparentDisplay functionA. Procurementpaintingnoodlestalk face-to-face with sb.formula, nonemustpressKey inputenter,screenDirectly on the screentouchtouchoption.
b.WendegreesetDing Ding(SV)Compared to reality(PV)valuedirectapparentshow.
c.apparentFault indicationstatusandsayClear troubleshooting methods.
d. Can beapparentCurrently showingholdRunning programnumber, paragraph, remainingtimeAnd the cycleringtimenumber.
e.WenDegree programsetfixedvaluewithimageXingquLine displayshow, withReal time displayProgram chartLine executionLine function.
f. The toolaloneprogramEdit Paintingnoodles, canloseenterWendegree,timeAnd the cycleringtimenumber.
g.screenThe screen can be used as a backlighttunewhole.
h.screencurtainapparentShow guaranteeprotectFunction can be customizedtime,TIMER or HandDynamic closing devicefixed.
3. Program capacity and control functions: a. Available programsgroup: Maximum 96aPATTEN (i.e. 96)A test ruleFan Kesetfixed).
b. Heavy weightRe execution行命令: Every oneaCommand canreach999 times
c.SEGMENTStime settingfixed0--99Hour59Min.
e. Havingpower outageprogrammemory,reply telegramAfterwards, fromActivate and continue to executeProgram functionality.
f. ProgramholdlinetimecanReal time displayshowimageXingquline.
g. HavingReservation launchandcloseMachine function.
h. With a date,time adjustmentComplete function.
Main components:
lCommunication Connectiontouchdevice: Taiwanbay
lThermal relaydevice: Taiwanbay
lcommunicationrelaydevice: OMRON,
lTime relaydevice: Taiwanbay
lController: independently developed
lsuperWenguaranteeprotectdevice: Taiwanbay
lelectricitysourcemain switch: Taiwanbay
lsolidState relaydevice: Taiwanbay
lpressButton switch: Taiwanbay
ldryburnguaranteeprotectdevice: Italy
Useelectricity press:AC3 ¢5 W 380V 50/60HZ.
Voltage variationchargeAllowable value: Freeze FramevoltageThe ±10%.
UseringBoundary: YunXuuseringrealm: 0 ~ 30℃
Performance guaranteeCertification environmentrealm: 5 ~ 25℃
Natural drainage outlet:intervalConnect drainage pipe1 VP30
There shall be no protrusions in the middle of the drainage pipe, and there shall be no protrusions on the floor of the housepouroblique
The drainage pipe is provided by our company,pleaseProvide drainage outlet (¢)20㎜).
ceremonyQi Zhouenclose60CMinsideCannot be releasedPlace other items
Excluding valuationitemObjective: 1.setplacefieldThe accuracyprepareengineering
2.loseenterSide electrical equipment
3.loseenterSide electricalmatchlineengineering

Basket type temperature shock test chamberInstallation site and installation method:
1.The placement should consider the heat dissipation efficiency and ease of inspection and maintenance of the machine
2.Although the machine itself is made of high-grade stainless steel plates, dark and humid places can easily cause adverse effects on the components and electronic controllers, leading to incorrect operation or accelerated aging. Therefore, it should be avoided.
3.The machine should be placed on a sturdy surface with drainage devices on the machine floor,Good ventilation should be maintained around the machine. The bottom of the machine is equipped with a refrigeration system, which generates a significant amount of heat. Therefore, during installation, the machine should be kept at a minimum distance from the surrounding environment, walls, and any other parts of the machine60A distance of at least centimeters is required for smooth ventilation, as shown in the picture:

4.Install and adjust the four horizontal feet at the bottom of the fuselage on a flat and vibration free ground to balance the fuselage, facilitate drainage of the inner box, and prevent abnormal noise (please check with a spirit level).
5.The installation position of the machine should not be directly exposed to sunlight. Please avoid direct sunlight exposure,To avoid affecting the testing conditions.And maintain indoor air circulation.
6.The installation position of the machine should be kept away from other electrical equipment or flammable materials as much as possible to avoid danger. Please place the machine body in a separate space and do not place it in public places or near flammable, explosive, or perishable chemicals to avoid fire and personal injury in case of malfunction.
7.Please avoid setting up in dirty and dusty places. The surrounding temperature and humidity should be maintained at10℃~25℃;70±10%RHbetween,Only machines can achieve good and stable operation,The consequences may lead to:The cooling speed of the machine is slow or cannot meet the requirements of low temperature,And the temperature control cannot be very stable.
8.No debris should be placed on the top of the aircraft to prevent heavy objects from falling and causing injury to the human body or damage to property.
9.Do not hold the electrical box, wires, or motor as a pivot point during transportation to prevent damage, loosening, or accidental failure of the electrical box or appliances.
10.The maximum inclination of the furnace body should be30Below the angle of °, the furnace body must be firmly secured to prevent it from falling, crushing, damaging or smashing people and property.
11.When the machine needs to be moved again after positioning, please retract the four horizontal feet of the body and then move it, and adjust the balance to avoid damaging the machine.
Power configuration and installation method:
Please distribute power according to the following method,Pay attention to the power capacity,Do not use multiple machines simultaneously with an external power source,To avoid pressure drop,Affects machine performance,Even causing malfunctions and shutdowns,Please use a dedicated circuit.
1. Supply circuit,Should be shortened as much as possible. When the power pressure is too low, please install a voltage stabilization system by yourself to increase the voltage to the rated value, so as not to be unable to start due to the low voltage and burn out the motor and controller.
According to the specification table, the power wiring is as follows::
|
| 1¢2W220VAC | √ | 50HZ |
|
| 3¢3W200VAC |
| 60HZ |
|
| 3¢3W380VAC |
|
|
| √ | 3¢5W380VAC |
|
|
3. The applicable power cord diameter is:(Cable length10mwithin)
|
| 2.0~2.5m㎡ |
| 8.0~10.0m㎡ |
|
| 3.5~4.0 m㎡ |
| 14~16 m㎡ |
| √ | 5.5~6.0m㎡ |
| 22~25m㎡ |
4. If it is a three-phase power supply,Please pay attention to the three-phase phase sequence and under phase protection.(If it is confirmed that the three-phase power supply is energized but the machine does not operate,Then the machine may be in reverse phase,Just exchange the two adjacent power lines with each other)And pay attention to ensuring proper grounding(To avoid danger caused by electric leakage).
5. If you connect the grounding wire to the water pipe,The water pipe must be a grounded metal pipe(Not all metal pipes,All can be effectively grounded).
6. Be careful not to damage the wiring during installation!Please do not connect the grounding wire,Connect it to the gas pipe.
7. Before configuring the power supply, please check whether the machine has been damaged during transportation, whether the power cord is damaged, whether the body is deformed, whether the air supply circulation is intact, and whether the inner box is kept clean.
8. Power cord configuration for the machine: Black is the neutral wire, yellow and green are the ground wires, and all other colors are the live wires.
9. The fluctuation amplitude of the input machine's power supply voltage should not exceed the allowable range, and the grounding wire must be in good condition, otherwise it will affect the performance of the machine.
10. Please be sure to configure appropriate safety devices according to the power of the machine to safely cut off the power supply in case of machine failure, in order to avoid fire and injury accidents.
11. Please make sure to position the machine in a safe space before wiring, and ensure that the wiring is consistent with the rated current and voltage of the machine, otherwise there may be electric shock and accidents.
12. Wiring operators should be professional to avoid damaging machines and burning components due to incorrect wiring and input of incorrect power sources.
13. Please confirm if the input power is disconnected before wiring to avoid electric shock.
14. If the machine has a three-phase motor, it is necessary to check whether its direction of rotation is correct when connecting the power supply. If it is a single-phase motor, its direction of rotation has been adjusted at the factory. When replacing it, it is necessary to confirm whether its direction of rotation is correct to avoid affecting the performance of the machine.
15. After wiring is completed, input a matching power supply while ensuring that the machine control electrical appliances are fault free. At the same time, all electrical box covers must be installed before powering on, otherwise there is a risk of electric shock and fire.
16. Non dedicated personnel are not allowed to repair and inspect this machine, and must disassemble and inspect it in the event of a power outage to avoid electric shock and fire.
17. It is not allowed to dismantle the electrical box, electrical box door, machine body side panel, and some safety protection devices for work. This method puts the machine in a dangerous operating state and is very dangerous.
18. The main power switch on the console should be operated less frequently, and only the power switch needs to be turned off when shutting down
19. The user can simply turn on the power switch.