Welcome Customer !

Membership

Help

Shandong Weihong Environmental Engineering Co., Ltd
Custom manufacturer

Main Products:

instrumentb2b>Products

Air flotation machine (Jiyang laundry wastewater treatment equipment)

NegotiableUpdate on 12/08
Model
Nature of the Manufacturer
Producers
Product Category
Place of Origin

Overview

1、 Application: Air flotation technology has been widely used in water supply, drainage, and wastewater treatment in recent years. It can effectively remove light flocs that are difficult to precipitate in wastewater

Product Details



1、 Purpose:

In recent years, air flotation technology has been widely used in water supply and drainage as well as wastewater treatment. It can effectively remove light flocs that are difficult to precipitate in wastewater.

2、 Characteristics

1Large processing capacity, high efficiency, and small footprint.

2The process and equipment structure are simple, easy to use and maintain.

3Can eliminate sludge swelling.

4Aeration into the water during air flotation has a significant effect on removing surfactants and odors from the water. At the same time, aeration increases dissolved oxygen in the water, providing favorable conditions for subsequent treatment.

5For water sources with low temperature, low turbidity, and high algae content, air flotation can achieve the best results.

3、 Main technical parameters:

Air flotation equipment can be divided into:5、10、20、30、40、50、60、80、100、150、200、250The300m3/hThe specifications can also be designed according to user needs.


item

eye

type

number

processing powerm3/h

Dissolved water volumem3/h

Main motor power

Kw

scrape

沬

machine

merit

rate

Kw

empty

press

machine

merit

rate

Kw

Dissolving gas tank

Specifications

mm

Overall dimensions

(Length x Width x Height)

mm

WHPF-05

4-5

1.5-2

2.2

0.37

1.5

Φ400×1000

3300×1800×2200

WHPF-10

8-10

2-3

2.2

0.37

1.5

Φ500×1512

4000×2100×2200

WHPF-15

10-15

4-6

2.2

0.37

1.5

Φ500×1512

4400×2100×2200

WHPF-20

15-20

5-7

2.2

0.37

1.5

Φ500×1512

4600×2400×2200

WHPF-30

20-30

6-10

5.5

0.37

1.5

Φ500×1512

5200×2600×2400

WHPF-40

30-40

8-13

5.5

0.55

1.5

Φ600×1880

6000×2600×2400

WHPF-50

40-50

15-20

5.5

0.55

1.5

Φ600×1880

7000×2600×2400

WHPF-60

50-60

18-27

7.5

0.55

1.5

Φ600×1880

7600×2800×2400

WHPF-70

60-70

22-30

7.5

0.55

1.5

Φ650×2034

8400×2800×2400

WHPF-80

70-80

24-32

7.5

0.55

1.5

Φ650×2034

9200×2800×2400

WHPF-100

90-100

30-35

15

0.55

3

Φ700×1980

10000×2800×2600

WHPF -150

125-150

60-80

22

1.1

3

Φ800×1980

13500×2800×2600

WHPF -200

175-200

80-100

22

1.1

3

Φ800×2100

15800×2800×2600

WHPF -250

225-250

110-120

22

1.1

3

Φ800×2400

18000×2800×2600

CXPF -300

280-300

120-180

37

1.1

5.5

Φ1000×2900

19200×3400×2800

The main technical parameters are shown in the table below:


The removal rate of pollutants after air flotation treatment is shown in the following table:

item

eye

waste

water

plant

class

Heavy metal ions such as zinc, copper, nickel, chromium, etc

%

color

%

CODcr

%

SS

%

other

%

Alcohol wastewater

≥30

≥40

≥85

electroplating wastewater

≥85

Chemical wastewater

≥90

≥45

Edible oil wastewater

≥50

≥85

≥85

papermaking wastewater

≥55

≥85

tannery wastewater

≥50

≥85

printing and dyeing wastewater

≥80

≥40

Due to significant differences in the quality of the treated wastewater, the above data is for reference only.

4、 Working principle:

The pollutants in sewage are divided into dissolved organic matter and insoluble substances (i.eSS), Dissolved organic matter can be converted into non soluble substances under certain conditions. One of the methods for wastewater treatment is to add coagulants and flocculants to convert most of the dissolved organic matter into non soluble substances, and then remove all or most of the non soluble substances (i.e. SS) to purify the wastewater. The main method for removing SS is to use air flotation.

After the chemical addition reaction, the sewage enters the mixing zone of air flotation and comes into contact with the released dissolved air water, causing the flocs to adhere to fine bubbles before entering the air flotation zone. Under the action of buoyancy, flocs float towards the water surface to form floating scum. The clear water in the lower layer flows through the collector to the clear water tank, and a part of it is refluxed for use as dissolved air. The remaining clear water flows out through the overflow port. After the floating slag on the surface of the air flotation tank accumulates to a certain thickness, it is scraped into the sludge tank of the air flotation machine by a scraper and discharged.

attached figure


5、 Installation, commissioning and precautions

(1) Installation

1. Before installing the equipment, the foundation must be compacted. And use concrete mortar to elevate 100-150mm. It can also be installed overhead, but the foundation must be able to bear the weight of the equipment during operation.

2. After the equipment is in place, it needs to be adjusted horizontally.

3. The equipment needs to be equipped with a cleaning sewer, which can be dug into an open channel or directly connected to a regulating tank through a pipeline for flushing the air flotation tank and discharging the water.

4. The connecting pipeline between the sewage inlet and the reaction tank should be as short as possible to prevent the flocs from being damaged in the pipeline.

5. The clear water outlet can be connected to the sewer for discharge. If it needs to enter the next treatment process, it can be directly connected to the next treatment equipment.

6. The sludge outlet can be connected to the sludge tank or sludge treatment equipment.

7. The electrical box should generally be placed on the side of the escalator, and the environment should be clean and tidy.

(2) Debugging:

A、 Before equipment debugging, the following preparations should be made:

1. Clean all the dirt and debris in the pool.

2. Lubricate parts such as water pumps and air compressors with oil.

3. Connect the power, start the water pump, and check if the direction of rotation is consistent with the direction indicated by the arrow. Start the air compressor manually and check if it is running normally. If any abnormal situation is found, promptly investigate the cause.

4. Press the foam scraper switch to move towards one end of the dissolved air system. After running to the end, under the action of the stroke collision block, the scraper moves in the opposite direction until it reaches the sludge tank. The stroke collision block flips up the scraper and presses the stop button to stop scraping. The scraper of the chain scraper moves counterclockwise.

B、 Trial operation:

1. Add water: Make the water level of the air flotation machine reach about 20-50mm from the upper edge of the sludge tank partition. The water level of the air flotation tank can be adjusted using a water collector.

2. Operation of dissolved gas system: Close all control valves, turn the electrical knob switch to the automatic position, start the water pump, and press the start button of the air compressor. The air compressor enters the working state, and then sequentially open the inlet valve, outlet valve, and control valve of the clean water pump. The pressure gauge gradually increases, generally reaching 0.4-0.5MPa. At this point, open the outlet control valve of the dissolved air tank to release the dissolved air through the release device into the air flotation tank. A large number of fine bubbles appear in the air flotation tank, causing the clear water to turn milky white. The dissolved air system is normal, and the higher the dissolved air pressure, the higher the density of the released dissolved air bubbles. The gas in the dissolved gas system is provided by an air compressor. Due to the continuous removal of air from the tank by dissolved water, the air inside the tank gradually decreases and the water level rises. When the water level rises to a certain position, the float level gauge will control the operation of the air compressor solenoid valve to ensure sufficient air volume in the tank.

3. Air flotation operation: After the dissolved air system is running normally, the wastewater after the dosing reaction is sent to the air flotation mixing tank. The flow rate is initially reduced and gradually increases to the rated value after it returns to normal.

4. Dissolved water: Dissolved water is first treated with tap water as the reflux water, and then treated with clean water as the reflux water. If the amount of detergent in waste water is large and there are many foam, which will affect the flotation effect, clean water can be used all the time.

5. After the accumulation of floating slag to a certain thickness, start the foam scraper.

6. When the equipment is shut down, the sewage control valve should be closed first, then the sewage pump should be turned off, the foam should be scraped off, the foam scraper should be stopped, then the clean water valve should be opened, tap water should be introduced and run for 30 minutes, the dissolved air outlet and inlet control valve should be closed, and finally the clean water pump should be stopped.

(3) Precautions and daily maintenance

1. The pressure gauge reading on the dissolved gas tank shall not exceed 0.6MPa.

2. Clean water pumps, air compressors, and foam blowers should be regularly lubricated with oil. Generally, air compressors should be lubricated every two months and replaced every six months.

3. The air flotation tank should be cleaned regularly depending on the amount of sediment.

4. The sewage entering the air flotation machine must be treated with chemicals, otherwise the effect will not be ideal.

5. Regularly check whether the safety valve on the dissolved gas tank is working reliably.

6. When the release device is blocked, the vacuum valve can be opened to open the release tongue, and it can be cleaned with clean water to flush the blockage. Then, the valve can be closed, which usually only needs to be opened for 10-20 seconds.


VIAfter sales service commitment

Strictly follow the requirements of the demand side, ensure progress, and ensure quality to complete the project. (2)All materials and overall projects provided by us shall be implemented12 Free warranty for one month, calculated from the date of final completion and acceptance of the entire project. (3)For any project that falls within the scope and content of our contracting, we will receive a repair notice upon receipt4Provide a response within the hour,48Someone must be sent to repair it within the hour. (4)We promise to be responsible for the quality of the project for life. We will provide spare parts at preferential prices for a long time, and store the main components, spare parts, vulnerable parts, etc. with patent rights, exclusive production and sales as spare parts on the buyer's site. (5)We promise to provide lifelong maintenance and repair services for this project at a discounted price (cost price), and specifically specify this fee standard in the handling plan as the basis for future contracts to ensure the normal use of this project. (6)If we fail to provide specific and detailed service fee standards as requested by the demander, the demander may determine all service fee standards that we should provide based on the service fee standards provided by other suppliers in this project or based on the cost price confirmed by the demander's audit department, and the principle of "lower than higher".