- Phone
-
Address
Industrial Zone, Dacheng County, Langfang City, Hebei Province
Dacheng County Guijin Pipe Support Factory
Industrial Zone, Dacheng County, Langfang City, Hebei Province


Air conditioning duct wooden pipe support steam insulation pad wood
main materialRed pine wood (with low thermal conductivity, strong compressive strength, and corrosion resistance); Economic poplar/willow wood; Optional rubber/PUR.
anti-corrosion treatmentVacuum soaking of epoxy coal tar asphalt 2-3 times (≥ 8 hours), depth ≥ 5mm, moisture content ≤ 12%, waterproof, mildew proof, insect proof, and crack proof.
structure180 ° split (Haff/saddle type), with upper circle and lower part, two halves embracing the pipeline, equipped with galvanized U-shaped clamps/clamps for installation.
Inner diameter (matching the outer diameter of the pipeline):Φ27(DN20)、34(DN25)、43(DN32)、48(DN40)、60(DN50)、76(DN65)、89(DN80)、108(DN100)、133(DN125)、159(DN150)、219(DN200)… 至 Φ1020(DN1000)。
Thickness (insulation layer thickness): 30, 40, 50, 60, 80, 100... 150;Width=Thickness(30 × 30, 40 × 40, 50 × 50... 150 × 150).
length: 100, 150, 200, 250 (customized according to bracket spacing).
Air conditioning duct (5-15 ℃ cold water/45-60 ℃ hot water): DefenseCold bridge condensationCold insulation, vibration reduction, and load-bearing capacity; Common specifications30×30/40×40Equipped with galvanized U-shaped card.
Steam pipeline (150-250 ℃)Thermal insulation bridge, reducing heat loss, preventing bracket overheating, buffering thermal expansion; Common specifications50×50/80×80Thickened asphalt for corrosion prevention.
commonalityIsolate the electrochemical corrosion of metal pipelines and supports to protect the insulation layer from crushing.
Air conditioning duct wooden pipe support steam insulation pad wood
standardHG/T 21629-1999 (J8/J9/A13 Cold Insulation Pipe Clamp), GB 50264-2013 (Insulation Engineering).
Installation:
The inner diameter of the cushion wood is equal to the outer diameter of the pipeline plus 2 times the insulation thickness, and it fits tightly without gaps.
Place the wooden pad on the bracket first, then place the pipeline, and fasten the U-shaped clamp symmetrically to avoid unbalanced load.
The thickness of the cold and hot water pipe pad is * * ≥ the thickness of the insulation layer * *, and the width is ≥ the width of the support bearing surface.