-
E-mail
yctech@vip.163.com
-
Phone
13913298876
-
Address
Changfeng Chaodongwei Port West, Daxin Town, Zhangjiagang City
Suzhou Yuchuang Fluid Technology Co., Ltd
yctech@vip.163.com
13913298876
Changfeng Chaodongwei Port West, Daxin Town, Zhangjiagang City
Maintenance and upkeep procedures for quadruple automatic permeameter
1、 Daily maintenance
Cleaning after the experiment
Immediately drain the liquid from the permeation container and rinse with deionized water3time
Use a soft bristled brush to clean the pores of the permeable stone (metal tools are prohibited from scratching)
checkOIs the sealing ring deformed (compression deformation ≤)15%)
Pipeline system inspection
Test the sealing performance of inlet and outlet valves(1MPaWater pressure maintenance10No leakage in minutes)
Remove impurities from the pipeline filter(100Stainless steel filter screen cleaned weekly
sensor calibration
Zero point calibration of water level sensor (error under no-load state)≤±0.1mm)
Comparison of pressure sensors with standard pressure gauges (range)0-1MPa,≤0.5%FS)
2、 Zhou Maintenance
Penetration system verification
Standard sand sample(D10=0.3mm)Recheck the permeability coefficient (≤10%)
Check the synchronization of the quadruple system (flow deviation of each channel)≤5%)
Electrical system testing
Measure the grounding resistance(≤4Ω)
Check the waterproof performance of the data cable connector(IP54Level testing)
3、 Monthly maintenance
Key component maintenance
Replace the sealing gasket of the permeation container(FluororubberMandatory replacement cycle6Months)
Lubricating lifting mechanism (food grade white oil, oil injection amount)2ml/Month)
System performance testing
Conduct no-load flow test(0.1MPaThe flow rate of pure water should be10±0.5mL/min)
Verify the automatic collection system (sampling interval)1sTime data loss rate ≤0.1%)
4、 Annual maintenance
Comprehensive maintenance
Disassemble the pressure pump and replace the plunger seal (cumulative operation)2000After hours)
Calibrate all sensors (requiring a calibration certificate from the metrology institute)
software upgrade
Update the permeability coefficient calculation module (compliant with the latest)ASTM D2434Standard)
5、 Key Maintenance Parameter Table
component Maintain indicators standard value testing tool
Permeable stone permeability coefficient ≥1×10⁻³cm/s Comparison of standard sand samples
pressure sensor nonlinear ≤0.3%FS Pressure calibrator
6、 Common fault handling
Abnormal permeability coefficient
Phenomenon: Test values deviate from standard values30%above
Processing procedure:
Check the blockage of permeable stones (ultrasonic cleaning)30Minutes)
Review the saturation level of the sample(BValue ≥0.95)
Calibrate pressure control system
Pipeline bubbles
Phenomenon: Data fluctuations>5%
Processing procedure:
Activate the automatic exhaust program
Check the inclination of the pipeline(≥5° elevation angle)
Replace the deaerated water (dissolved oxygen)≤2mg/L)
Four out of sync
Phenomenon: Flow difference between channels>10%
Processing procedure:
Check the consistency of valve opening in each channel
Clean the internal flow channel of the splitter
Re calibrate the flow sensor
7、 Safety precautions
Chemical safety
Wear acid and alkali resistant gloves (such as butyl rubber) when in contact with chemical reagents
Waste liquid according toGB8978classified collection
Electrical safety
Disconnect before maintenance24VPower supply (capacitor discharge time ≥)1Minutes)
Operating Specifications
The maximum working pressure shall not exceed1.2Double rated value (marked with red warning line)
8、 Maintenance Record Form
date maintenance project executor Next maintenance date remark
2024-03-01 Permeable stone cleaning Engineer Wang 2024-04-01 ultrasound40kHz/30min
2024-03-15 Pressure sensor calibration Engineer Li 2024-06-15 +0.25%FS
Attachment: Tree diagram of maintenance cycle for permeameter
text
copy
download
Daily maintenance(15min)
∝ - Container Cleaning
▽ - Sensor Inspection
└ - Pipeline Drainage
Weekly maintenance(2h)
∝ - Standard Sample Verification
∝ - Electrical Testing
└ - Data Backup
Annual maintenance(8h)
▽ - Comprehensive dismantling and inspection
∝ - Metrological Calibration
└ - System Upgrade
The implementation of this regulation ensures that the equipment complies with the "Standard for Soil Test Methods"(GB/T50123-2019)Requirement: Maintain the accuracy of permeability coefficient testing within ±5%Extend the service life of the equipment to8Years or more. It is recommended to use the original factory maintenance kit (including specialized sealant, calibration tools, etc.) in conjunction.