-
E-mail
yctech@vip.163.com
-
Phone
13913298876
-
Address
Changfeng Chaodongwei Port West, Daxin Town, Zhangjiagang City
Suzhou Yuchuang Fluid Technology Co., Ltd
yctech@vip.163.com
13913298876
Changfeng Chaodongwei Port West, Daxin Town, Zhangjiagang City
Maintenance and upkeep procedures for electric quadruple direct shear tester
1、 Daily maintenance
Cleaning after the experiment
Remove residual soil samples from the cutting box and use a soft bristled brush to clean the pores of the permeable stone
Wipe the contact surface of the shear box with anhydrous ethanol (corrosive solvents are prohibited)
Check the integrity of the filter paper, every test5Replace the filter paper with a new one
Transmission system inspection
Check the lubrication status of the ball screw (replenish lithium based grease every month)
Confirm that the guide rail has no scratches (roughness)Ra≤0.8Mm)
Manually push the shear box and check the movement resistance (should be≤5N)
sensor calibration
Perform zero point calibration of the force sensor during daily startup (in an unloaded state)
Calibration of displacement sensors using standard gauge blocks(≤0.01mm)
2、 Zhou Maintenance
Key component inspection
Measure the flatness of the shear box (using0.02mmGauge detection, gap ≤0.05mm)
Check the permeability of permeable stones (water injection rate should be≥10mL/min)
Test motor torque (rated value)±5%Within the scope)
Electrical system testing
Check the tightness (torque) of the wiring terminals0.5N·m)
Measure the grounding resistance(≤4Ω)
3、 Monthly maintenance
System performance testing
Conduct no-load operation test (speed)0.01-2.4mm/minNo lag throughout the entire process
Calibration of standard weights vertically/Shear force sensor (≤0.5%FS)
Check the data collection system (sampling frequency)≥10Hz)
mechanical adjustment
Adjust the tension (deflection) of the drive belt3-5mm/10NPressure)
Replace worn guide bearings (cumulative operation)500After hours)
4、 Annual major maintenance
Comprehensive dismantling and inspection
Replace all sealing rings (mandatory replacement cycle for nitrile rubber parts)1Year)
Check the gearbox gear oil(ISO VG220, replacement cycle2000Hour)
System calibration
Entrust a measuring unit to calibrate the entire machine (issue)CMACertification Report
Update control software (compatible with the latest geotechnical testing standards)
5、 Key Maintenance Parameter Table
component Maintain indicators standard value testing tool
Cutting box flatness ≤0.05mm Optical flat crystal
force sensor nonlinear, ≤0.3%FS standard weight
displacement sensor repetitiveness, ≤0.01mm dial indicator
motor temperature rise ≤65℃ (continuous)4h) Infrared Thermometer
6、 Common fault handling
Abnormal shear force
Phenomenon: The test value is too small20%above
Processing procedure:
Check the wiring of the sensor
Calibration force value system
Check the fixing bolts of the shear box (torque)15N·m)
Displacement stuck
Phenomenon: Unstable movement speed
Processing procedure:
Clean the guide rail and add lubricating oil
Check the concentricity of the coupling(≤0.02mm)
Test the output current of the motor driver
Data jump
Phenomenon: Peak appears in the collection curve
Processing procedure:
Check the grounding system
Replace the shielded signal cable
Update the filtering parameters of the acquisition software
7、 Safety precautions
Electrical safety
Before maintenance, the power must be cut off (voltage test)≤36V)
Capacitor discharge time≥3minute
Mechanical safety
Hands are prohibited from entering when the cutting box is moving (safe distance)50mm)
The maximum vertical load shall not exceed the rated value (usually50kPa)
Environmental Requirements
Storage temperature10-35℃
relative humidity30-70%RH