Welcome Customer !

Membership

Help

Shenzhen Wanandi Technology Co., Ltd
Custom manufacturer

Main Products:

instrumentb2b>Article

Shenzhen Wanandi Technology Co., Ltd

  • E-mail

    zengwr@szwandi.com

  • Phone

    17727549507

  • Address

    5th Floor, Building B, Hexi Hangcheng Industrial Zone, No. 135 Qianjin 2nd Road, Taoyuan Community, Xixiang Street, Bao'an District, Shenzhen City

Contact Now
WANDI Wanandi | Smart Waste Incineration Power Plant - Extraction Gas Monitoring System
Date: 2025-08-29Read: 1

With the increasing amount of urban household waste year by year, the construction, operation, and renovation of waste incineration power plants have brought certain impacts on the health and safety of workershidden dangerIf there are flammable gases (methane, acetylene), highly toxic gases (hydrogen sulfide, carbon monoxide, ammonia), and oxygen deficiency risks in limited spaces such as garbage storage pits, leachate treatment tanks, etc.

WANDI万安迪|智慧垃圾焚烧发电厂- 抽取式气体监测系统

Traditional online gas detectors for direct installation and monitoring face maintenance difficulties, technical limitations, and remote monitoring issues. Today, the editor recommends for youExtraction gas monitoring systemThe plan aims to systematize the monitoring and management of flammable and toxic gases in confined spaces, reduce equipment maintenance costs, and ensure safe production and personal safety.

We independently developed and designed itFIX3500Extraction gas monitoring system,The system integrates gas extraction, preprocessing, gas detection, over limit alarm, video monitoring, data transmission, and emergency management, and can be quickly deployed to application sites for monitoring and surveillance upon startup. When the concentration exceeds the limit, immediately trigger the sound and light alarm, and coordinate with the command center and on-site personnel to carry out emergency response work. the planSolved management challenges such as difficult installation and wiring of waste incineration power plants, short equipment lifespan, and lack of coordination between monitoring and emergency management. Our on-site implementation project is as follows:

WANDI万安迪|智慧垃圾焚烧发电厂- 抽取式气体监测系统

Our company's extraction gas monitoring systemNot only forWaste to Energy PlantStable operation provides security guarantees and eliminates the psychological concerns of staff from a technical perspective, ensuring a safe working environment. This product is innovative based on national and local policy regulations, according to the following:

◆Regulations on Safety of Limited Space Operations in Industrial and Commercial Enterprises (Order No. 13)

Five Regulations on Safe Operations in Limited Spaces (Order No. 69 of the State Administration of Work Safety)

◆ Safety Regulations for Operations with Oxygen Deficiency Hazards (GB 8958)

◆ Safety Management Regulations for Hazardous Operations in Limited Spaces in Guangdong Province (Yue An Jian [2004] No. 79)