Welcome Customer !

Membership

Help

Anhui Kemi Instrument Co., Ltd
Custom manufacturer

Main Products:

instrumentb2b>Article

Anhui Kemi Instrument Co., Ltd

  • E-mail

    17333007727@163.com

  • Phone

    19856658785

  • Address

    Kemi Industrial Park, Intersection of Shuanglong Road and Wangke Road, Economic Development Zone, Hefei City

Contact Now
Operation Guide for Remote Magnetic Stirring Reactor
Date: 2025-08-26Read: 1
Quick opening magnetic stirring reactorAdopting double caliper quick opening method, mortise and tenon sealing structure, reinforced PTFE sealing gasket is used below 300 ℃, and the main structure is integrally processed and formed without welding structure, which is safe and reliable. The core accessories are all imported brands. The magnetic stirring component adopts a DC brushless motor combined with a high magnetic magnet, which has a large stirring torque; Fully static sealing structure to avoid potential leakage issues caused by dynamic sealing; The reaction vessel can be designed to withstand pressure according to customer requirements and can operate for a long time at a pressure of 345 bar (5000 psi).
Operation guide:
Equipment inspection and preprocessing:
Sealing verification: Before use, the sealing ring of the kettle body should be checked to ensure that there are no cracks or deformations. The alignment error of the magnetic coupling component should be ≤ 0.5mm.
Safety device testing: Confirm that the bursting disc has not expired and that the opening and closing pressure values of the safety valve meet the experimental requirements (usually set to 1.1 times the working pressure).
Remote connection configuration: Establish device communication through Labworldsoft software or dedicated APP, ensuring network stability and firewall permission for data transmission.
Intelligent operation process:
Parameter setting:
Enter the target temperature (accuracy ± 0.2 ℃) and pressure range on the control interface.
Set up a segmented heating program (such as holding every 10 ℃ for 5 minutes) to avoid thermal shock.
Real time monitoring:
Observe the torque change curve (reflecting viscosity changes) through a TFT screen.
When connecting an external pH probe, the BNC interface needs to be calibrated, and the recommended data sampling interval is ≤ 30 seconds.
Emergency response:
When the overpressure alarm is triggered, the pressure relief valve is automatically triggered, and manual remote forced cooling can be achieved.