ZZC50 Three way Transformer DC Resistance Tester

NegotiableUpdate on 05/13
Model
Nature of the Manufacturer
Producers
Product Category
Place of Origin

Overview

The ZZC50 three-way transformer DC resistance tester is designed specifically for measuring the DC resistance of transformers. It is a necessary test item for semi-finished and finished products in transformer manufacturing, factory testing, installation, handover testing, and preventive testing by the power department. It can effectively detect manufacturing defects such as loose materials, welding, connection parts, missing strands, and broken wires of transformer coils, as well as hidden dangers after operation. In order to meet the needs of rapid measurement of transformer DC resistance, our company has developed a transformer DC resistance tester using our own technological advantages. This instrument is a new generation rapid testing device that integrates magnetic assisted testing, three-phase testing (Yn, Y, △), and demagnetization functions. It is used for testing

Product Details

1 ZZC50 Three way Transformer DC Resistance TesterOverview

For the power system, transformers are the core equipment in the system, so the long-term and reliable operation of transformers is related to the stability and reliability of the entire system.

The DC resistance of transformers is a necessary test item for semi-finished and finished products in transformer manufacturing, factory testing, installation, handover testing, and preventive testing by the power department. It can effectively detect manufacturing defects such as material selection, welding, loose connection parts, missing strands, and broken wires of transformer coils, as well as hidden dangers after operation.In order to meet the needs of rapid measurement of DC resistance in transformers, our company has developed using our own technological advantagesA transformer DC resistance tester. This instrument is a setMagnetic assisted testing, three-phase testing(and Y,andDemagnetization functionThe new generation of rapid testing equipment integrated into one isIdeal equipment for measuring the DC resistance of large power transformers.The screen adopts a true color large screen high-resolution LCD display, with touch control and shuttle knob operation, making it convenient for on-site use. It has a Chinese menu prompt function, easy and intuitive operation, and can complete all direct resistance test items in one wiring. The testing speed is fast, the accuracy is high, and the range is wide.

2 Packaging Content

After receiving the shipping packaging box, open the box and check for any damage. If the shipping packaging box is damaged or the cushioning material has pressure marks, please notify the shipping company and the nearest sales office of our company.

Please check if you have received the following items in the entire set of equipment:

Standard configuration:

√ 1 tester

√ 1 set of test lines (2 yellow, 2 green, 2 red, 1 black)

√ 1 three core power cord

√ 1 grounding wire

√ 3 insurance tubes (1)0A)

√ 2 rolls of printing paper

√ 1 printed user manual

√ 1 factory test report

√ 1 certificate of conformity and warranty card

3 ZZC50 Three way Transformer DC Resistance TesterMain functions and features

3.1 ForYn type, Y type, and △ type windings can all be tested using three-phase measurement method, and the three-phase unbalance rate can be calculated.

3.2 Test the maximum output current of the power supply50A, Test range 0~25K Ω, meeting the testing requirements of the vast majority of transformers; And it integrates magnetic assistance and demagnetization functions to meet various on-site testing needs.

3.3 The testing process can automatically calculate5S、15S、30The rate of change in resistance value within S can assist testers in determining the stability of test data and prevent misreading of data.

3The instrument has 380Multiple protection functions such as V misconnection protection, back electromotive force protection, wire breakage protection, and power-off protection, as well as an alarm function for ungrounded grounding wire.

3.5 The instrument is equipped with a thermal printer, which stores data locally200Supports massive storage on USB drives.

3.6 industrial-grade7The inch true color large screen display features a fresh and simple display style design, with full touch and one click shuttle operation, creating a comfortable and convenient human-machine interaction experience for you.

4 ZZC50 Three way Transformer DC Resistance TesterMain technical indicators

technical indicators

output current

single-phase 50A、20A、10A、5A、1A、0.2A、10mA、<1mA

three-phase 25A+25A、10A+10A、5A+5A、1A+1A、0.2A+0.2A

measurement range

single-phase50 A gear75μ Omega0.4Ω 20 A gear 0.5m Ω~1 Ω

10A gear 1.0m Ω~2 Ω 5A gear 10 m Ω~4 Ω

1 A gear 0.1Ω to20Ω 0.2A gear 1.0Oh!100Ω

10MA gear 50Oh!2<1mA gear 500Oh!25

three-phase

25A +25A gear0.1mΩ ~0.25Ω

10A+10A gear0.5mΩ ~0.6 Ω

5 A+5 A gears 10 mΩ ~1.5 Ω

1 A+1 A gear 0.1 Oh!7.0 Ω

0.2A+0.2A gear1.0 Oh! 30 Ω

accurate indeed degree

± (reading x 0.2%+2 words)

working power supply

AC220V±10%, 50/60Hz

Operating temperature

-10℃~50℃

relative humidity

90%, no condensation

Instrument volume

428mm×350mm×230mm

Instrument weight

13.4 kg









5 ZZC50 Three way Transformer DC Resistance TesterPanel Introduction

ZZC50三通变压器直流电阻测试仪


1. High voltage wiring terminals.

Connect the high-voltage side bushing of the transformer.

2. Low voltage wiring terminals. :

Connect the low-voltage side bushing of the transformer.

3. Capacitive touch screen.

Display Size7.0Inch; resolution1024×600.

4. One click shuttle knob:

All functions of the instrument can be operated.

5. Emergency stop button.

Pressing the emergency stop button during the testing process will immediately stop the test; After pressing the emergency stop button, it should be reset for the next use of the instrument to test its functionality.

6. Power on key.

Turn on the power switch button approximately2S startup.

7. Grounding terminal and grounding indication.

The instrument must be reliably grounded. The grounding point on site may have paint or rust, and must be cleaned thoroughly. If the indicator light is on, please check the grounding wire.

8. Input overvoltage indication.

The red light is on, indicating that the power input exceeds the allowable power input range of the instrument.

9. USB interface.

External USB drive used to store test data; Please useUSB flash drives in FAT or FAT32 format; During the storage process, it is strictly prohibited to remove the USB drive.

10. printer.

Print the test results.