- Phone
-
Address
508, Building 4, Lane 680, Shuishe West Road, Baoshan District, Shanghai
Shanghai Xuji Electric Co., Ltd
508, Building 4, Lane 680, Shuishe West Road, Baoshan District, Shanghai
On site installation of dynamic balancing instruments
Install sensor horizontally
Install phase probe
Paste reflective tape
connecting cable

harmonic analysis
1. Start the machine and run it until the measured speed is reached
2. Open - View - Select Harmonic Analysis
3. Analyze the cause of vibration based on frequency doubling


Workpiece parameter settings: Try to remove the duplicate

Double sided dynamic balance
1. Set measurement method

2. Select calibration and enter the file number

3. Do not add trial weight for now

4. Start the rotor to measure the speed, pressstart, appearedOKStop the machine

5. Add the test weight to the left at 0 degrees, enter the weight and angle, Start the rotor to achieve measurement rotation Speed, pressStartappearOKShut down.


6.Remove the left trial weight, Add to the right, enter weight and angle, StartMoving and turning 子, To reach the measured speed, pressStart Automatic measurementInterface.

7. Click on the red position on the left and remove the weight test on the right, based on the initial weight and angle Add counterweight

• Single sided dynamic balancing three steps
• Sensor installation- Preparation work
• Step 1: idling
•Step two: Add trial weight to the left, and remove the trial weight after collection is completed.
•Step three: Add trial weight on the right and collect it. Remove the trial weight
Add weight according to the display
•Qualified, report issued, unqualified, secondary weighting!