-
E-mail
whhuatian@163.com
- Phone
-
Address
Building T4, Gufang, No. 41 Gaoxin 2nd Road, Donghu New Technology Development Zone, Wuhan City, Hubei Province
Wuhan Huatian Power Automation Co., Ltd
whhuatian@163.com
Building T4, Gufang, No. 41 Gaoxin 2nd Road, Donghu New Technology Development Zone, Wuhan City, Hubei Province
The latest Measures for the Administration of License for Installation (Repair, Testing) of Electric Power Facilities will come into effect on October 11, 2020. The "Measures for the Administration of License for Installation (Repair, Testing) of Power Facilities" (Order No. 28 of the State Electricity Regulatory Commission) announced by the former State Electricity Regulatory Commission on December 18, 2009, are hereby abolished. Huatian Power provides a brief introduction to the new version of the construction equipment selection guide required for the third level power facility license for installation (repair, testing) and testing.
Obtaining a third level installation (repair, testing) license, one can engage in the installation, maintenance, or testing activities of power facilities with voltage levels below 110 kV.
To learn about the application materials and filling specifications for the installation, maintenance, and testing of power facility licenses, you can click on "Application Specifications" to browse.
Alternative names: Level 3 Testing Instruments, Level 3 Testing Equipment, Testing Instruments and Equipment, Level 3 Testing Configuration Table, Level 3 Testing Equipment, Level 3 Testing Equipment Selection Table
| serial number | Name of machinery and equipment | unit | quantity | Specifications | Specification Model |
| one | High voltage generating equipment | ||||
| 1 | DC high voltage generator | set | 1 | DC:200kV/3mA | ZGF-200kV/3mA |
| set | 1 | DC:120kV/2mA | ZGF-120kV/2mA | ||
| 2 | Power frequency withstand voltage test device | set | 1 | AC: 10kVA/100kV | GSB-10kVA/100kV |
| set | 1 | AC: 5kVA/50kV | YDJ-5kVA/50kV | ||
| 3 | Complete set of equipment for frequency conversion series resonance test | set | 1 | 500kVA/200kV/2.5A 30~300Hz |
HTXZ-500kVA/200kV |
| 4 | Induction voltage withstand test device | set | 1 | 5kVA/360V 150Hz |
SBF-5kVA/500V |
| two | Electrical measuring instruments | ||||
| 1 | High voltage dielectric loss tester | Taiwan | 2 | 1. The accuracy of medium measurement is 1% 2. The capacitance accuracy is 0.5% 3. Anti interference frequency conversion |
HTJS-V |
| 2 | Circuit resistance tester | Taiwan | 2 | DC:≥100A | HTHL-100A |
| 3 | Transformer volt ampere characteristic tester | Taiwan | 1 | 1100V/5A | HTFA-103 |
| 4 | Grounding resistance tester | Taiwan | 1 | Frequency difference method | HTDW-5A |
| 5 | Capacitance and inductance tester | Taiwan | 1 | HTRG-H | 6 | Grounding continuity tester | Taiwan | 1 | DC:1A | HTDT-10A |
| 7 | Transformer DC resistance tester | Taiwan | 2 | DC:≥10A | Htzz-- 10 A |
| 8 | Transformer ratio tester | Taiwan | 1 | Digital 0.5 level | HTBC-H |
| 9 | Transformer winding deformation tester | Taiwan | 1 | Frequency response method | HTBX-H |
| 10 | Load tap changer tester | Taiwan | 1 | I≧1A | HTBYC-3000 |
| 11 | Circuit breaker characteristic tester | Taiwan | 2 | HTGK-III | |
| 12 | Zinc oxide lightning arrester resistive current tester | Taiwan | 1 | HTYB-3H | |
| 13 | Three phase relay protection tester | Taiwan | 2 | Two sets of three-phase voltage and current each | HT-1200 |
| 14 | Lightning strike counter calibrator | only | 1 | HTFZ-III | |
| 15 | Insulation resistance tester | Taiwan | 2 | DC:0~5000V 200G(Ω) Short circuit current ≥ 3mA |
GM-5kV |
| three | Oil and gas testing instruments | ||||
| 1 | SF6 leak detector | Taiwan | 1 | Sensitivity 1ppmv | XP-1A |
| 2 | SF6 gas micro water tester | Taiwan | 1 | HTWS-V | |
| four | Common instruments and meters | ||||
| 1 | megohmmeter | only | 1 | DC:2500V | HT2671 |
| 2 | megohmmeter | only | 1 | DC:500V | HT2670 |
| 3 | Digital dual clamp phase voltmeter | only | 1 | Measure current 1mA~5A | SMG2000B |
1. All national users who purchase our products enjoy free technical guidance, software upgrades, one-year warranty, and lifelong maintenance services.
2. To learn more about Huatian products, please enter the product center. Service Hotline: 400-8855-448
Those who have obtained the third level testing license for the installation (repair, testing) of power facilities can engage in testing activities for power facilities with voltage levels below 110kV. The applicant shall meet the following conditions:
1、 Net assets
Having net assets suitable for carrying out installation (repair, testing) of power facilities, with a proportion of no less than 15% of the total assets.
2、 Technical Manager, Safety Manager
Applicants for first to third level licenses must have at least 5 years of experience in the installation, maintenance, or testing management of power facilities that are suitable for the type of license being applied for, and hold intermediate or higher professional titles in power related fields; Those who apply for a first level license should have a senior professional title in the field of electricity.
3、 Professional technical and skilled personnel
For those applying for first to third level licenses, there shall be no less than 50, 30, and 15 professional and technical personnel in the field of electric power, among whom no less than 30, 15, and 5 have intermediate or above technical qualifications respectively; There shall be no less than 60, 30, and 20 professionals with specialized skills in the field of electricity, including no less than 30, 15, and 10 high-voltage electricians.
4、 For those applying for Level 1 to Level 3 licenses, in addition to meeting the above conditions, they should also have the following performance that is suitable for the category and level of the license being applied for:
1. For those applying for Level 1 to Level 3 installation permits, they should have a track record of engaging in the installation of transformer (distribution) and line facilities with voltage levels below 330 (220) kV, 110 (66) kV, and 35 kV and above, respectively, within the past three years, and the quality should be qualified; During this period, the highest annual engineering settlement income engaged in power facility installation business shall not be less than 200 million yuan, 100 million yuan, and 30 million yuan, respectively.
2. For those applying for Level 1 to Level 3 maintenance or testing licenses, they should have a track record of engaging in maintenance or testing activities for transformer (distribution) and line facilities with voltage levels below 330 (220) kV, 110 (66) kV, and 35 kV and above, respectively, in the past two years.
200kV/3mA DC High Voltage Generator
120kV/2mA DC High Voltage Generator
10kVA/100kV power frequency withstand voltage test device
5kVA/50kV power frequency withstand voltage test device
Complete set of equipment for frequency conversion series resonance test
Induction voltage withstand test device
High voltage dielectric loss tester
Circuit resistance tester
Transformer volt ampere characteristic tester
Grounding resistance tester
Capacitance and inductance tester
Grounding continuity tester
Transformer DC resistance tester
Transformer ratio tester
Transformer winding deformation tester
Load tap changer tester
Circuit breaker characteristic tester
Zinc oxide lightning arrester resistive current tester
Three phase relay protection tester
Lightning strike counter calibrator
Insulation resistance tester
SF6 leak detector
SF6 gas micro water tester
2500V megohmmeter
500V megohmmeter
Digital dual clamp phase voltmeter
Our company's products are strictly produced in accordance with international and national standards and industry regulations. They have passed the testing of national, provincial, and municipal power research institutes, measurement centers, and authoritative power departments, and have fully passed the ISO9001 international quality management system certification, the People's Republic of China manufacturing measuring instrument license, GB/T19001-2016 quality management system requirements, GB/T24001-2016 environmental management system requirements, and GB/T45001-2020 occupational health and safety management system requirements.