- Phone
-
Address
Shuibei, Yaotang Street, Jintan District, Changzhou City
Changzhou Yukun Instrument Manufacturing Co., Ltd
Shuibei, Yaotang Street, Jintan District, Changzhou City
Introduction to Shaker Large Capacity Cyclotron Oscillator
The appearance is beautiful, elegant, and efficient, saving space. It has digital speed measurement, adjustable speed, and easy operation. It is a commonly used instrument for scientific research and production in industries such as biotechnology, medicine, health, microbiology, etc.
Shaking table large capacity rotary oscillator SHAKER main parameters
electricitysource 220V/50HZ
timing range 0-9999 minutes
motor power 300W
vibratewidth 10mm
mode of exercise swirl
tuneSpeed range start-300 times/minutespeeddegreedigital display
Shaker Large Capacity Cyclotron OscillatorUsage
1. Using at medium speed within the speed range can extend the lifespan of the instrument.
2. The instrument should be placed on a sturdy workbench, with a clean and tidy environment, moderate temperature, and good ventilation.
3. Before using the instrument,checkpower switchCheck if the speed is in the Z gear.
4. To ensure good balance performance of the instrument during operation and avoid significant vibration, all test bottle positions should be filled when bottling, and the culture solution in each bottle should be roughly equal. If there are not enough culture bottles, the test bottles can be symmetrically placed or filled with other equal amounts of solution to fill the empty spaces.
5. Select timing, connect the external power supply, place the power switch in the "on" position, the indicator light will turn on, and slowly adjustspeedIncrease the required speed for DAO.
Shaker Large Capacity Cyclotron OscillatorMaintenance of instruments
1. Before each shutdown. Must bespeedPlace it in the Z position, turn off the power switch, and cut off the power supply
2. Proper use and maintenance of instruments can prolong their lifespan by keeping them in good working condition
3. During continuous operation, the instrument should be regularly inspected every three months to check for water droplets, dirt, and other debris falling onto the motor and control components. The water quality and cleanliness of the water tank should be checked, and fuses, control components, and fastening screws should be checked