-
E-mail
941593506@qq.com
-
Phone
1516964627915169646279
-
Address
Building 67, 14278 Jiankang East Street, Kuiwen District, Weifang City, Shandong Province
Shandong Runchuang Environmental Protection Equipment Co., Ltd
941593506@qq.com
1516964627915169646279
Building 67, 14278 Jiankang East Street, Kuiwen District, Weifang City, Shandong Province
| brand | Runchuang Environmental Protection | Processing & Customization | yes |
|---|---|---|---|
| processing capacity | 0.5m³/h | Main material | carbon steel |
| pump power | 0.125kw | rated voltage | 220v |
Linjiang Dental Medical Sewage Treatment Plant
The construction plan for the sewage pipeline network and treatment facilities in Shuikou Town, Shizhong District includes the construction of approximately 4.8 kilometers of pipeline network and integrated treatment stations along the river in the early stage. The plan aims to collect approximately 5000 people and a total of 0.08 million tons/day of domestic sewage from Shuikou Town for centralized treatment. The project started in April this year and is expected to be completed by the end of December this year.
In the long term, after the development and construction of the road framework in Shuikou Town, Shizhong District, the domestic sewage in Shuikou Town will be connected to the city's third sewage treatment plant for treatment and discharged in compliance with standards.
It is reported that among the 211 townships in the city, 27 are connected to the urban pipeline network, of which 115 have been built. The remaining 69 townships need to build new sewage treatment facilities. The total design scale of the 115 township sewage treatment plants that have been built is 65000 tons/day, with an actual treatment capacity of 35000 tons/day, a supporting pipeline network length of 340 kilometers, and a township sewage treatment rate of 46%.

Hospital sewage refers to the sewage and feces discharged into the hospital septic tank; After primary or secondary treatment and disinfection, the discharge standards for sewage and sludge are met respectively. Sewage is discharged into the urban sewer network, while sludge is used as fertilizer for farmland. Other pollutants that have not been discharged into septic tanks are not included. The sewage from the infectious disease ward and the general ward of the newly built comprehensive hospital should be separated and disinfected separately.
Based on the fact that medical wastewater contains a large amount of pathogenic bacteria, viruses, insect eggs and other pathogens, as well as chemical agents and radioactive isotopes, which have the characteristics of space pollution, acute and latent infection, and pose great harm, the RC series of small-scale medical wastewater treatment equipment has been developed. The RC series small-scale medical sewage treatment equipment has been applied in medical institutions in multiple provinces, cities, and towns across the country, and has received high praise from customers.
Scope of Application
1. Wastewater treatment for comprehensive medical institutions below the county level or with less than 20 beds, as well as all other medical institutions.
2. The RCXD medical sewage treatment equipment is suitable for medium and small-scale community medical clinics, dental clinics, hospital outpatient clinics, beauty and body care units, and other units that require small-scale sewage treatment due to housing shortages.
3. Central blood station, physical examination center.
4. Small animal husbandry laboratory and operating room sewage treatment.
5. The equipment does not require the construction of a separate water collection tank, and sewage can be directly connected to the equipment inlet. When the water level reaches automatic treatment, the equipment will stop running if the water level is insufficient.
RCXDCharacteristics of series equipment:
1. Small footprint and easy installation
2. Automatic operation, simple operation, and no need for dedicated personnel to manage the entire system
3. The system processing effect is stable and reliable
4. No need to add chemicals, saving subsequent operating costs
5. Beautiful appearance, compact structure, easy to move
6. The equipment can be disinfected using ozone, chlorine tablets or chlorine dioxide disinfectants, and various disinfection methods can be configured according to user requirements.
Equipment process
The RCXD sewage treatment equipment uses physical or chemical methods to treat sewage (according to user requirements) without the need for adding drugs, and there will be no excessive chlorine emissions, resulting in no subsequent investment costs. The main component of the process is ozone disinfection. Ozone disinfection, its sterilization mechanism is to destroy and oxidize the cell membrane, cytoplasm, enzyme system, and nucleic acid of microorganisms, thereby rapidly inactivating bacteria and viruses. Ozone uses air as raw material and has a killing rate of over 99% against pathogenic microorganisms, bacteria, viruses, etc. contained in medical institution wastewater. The entire equipment has a continuous service life of 30000 hours under standard conditions.
Ozone is composed of an oxygen molecule (O2) carrying an oxygen atom (O), and it is an allotrope of oxygen. Ozone has a strong oxidizing ability, and oxygen atoms can oxidize the cell wall of bacteria until they penetrate the cell wall and form unsaturated bonds with their bodies to take bacterial life. Its function is instantaneous, and the rapid sterilization effect of ozone depends on its high reduction potential. Its function is immediate, and the rapid sterilization effect of ozone is determined by its high reduction potential.
Instructions for use:
1. Connect the sewage to the inlet of the equipment, connect it to an AC220V power supply, and set the controller to automatic mode. The equipment will then operate fully automatically.
2. If the device encounters special circumstances that prevent it from operating, manual control mode can be enabled, and the controller can be put into manual mode. Ozone can be turned on in manual mode.
After sales service commitment
All products sold by our company come with a one-year warranty, lifetime warranty, free design and selection, and free technical consultation.
Company Introduction
Located in the Kite Capital of Weifang, Shandong Province, our company is located in Kuiwen District, Weifang City. We specialize in the research and development, production, sales, and technical services of various water treatment equipment in this city. The company's products combine multiple advantages, with excellent technology and quality. The company has passed the ISO9001-2016 quality system certification.
Our company's chlorine dioxide generators, buried sewage treatment equipment, domestic sewage treatment equipment, reclaimed water reuse equipment, hospital sewage treatment equipment, dosing equipment, and dechlorination equipment have been widely used in various cities across the country. The company adheres to the principle of "quality and reputation" and warmly serves customers. Welcome users to choose, visit and guide us, and sincerely hope to provide valuable feedback on our company's products!
Performance principle:
Safe and reliable; Performance indicators are superior to national standards; High degree of automation; Easy to operate and maintain.
In order to accelerate the construction of urban sewage treatment facilities in Leshan, Leshan City specially formulated the "Three Year Promotion Plan for Urban Sewage Treatment Facilities in Leshan City" last year, with a total investment of 2.49 billion yuan, an additional sewage treatment capacity of 130000 tons/day, a new sewage pipeline network of 755 kilometers, the renovation of 53 kilometers of old sewage pipeline network, and the renovation of 90 kilometers of combined sewer pipeline network.
It is reported that the city has implemented the renovation of 35 domestic sewage discharge outlets along the Minjiang River, Dadu River, Qingyi River, and Zhugongxi within the central urban area of Leshan, as well as the renovation of black and odorous water bodies in Shenjiachong Gully. A total of 45 kilometers of sewage pipe networks have been newly built and renovated.
At present, the preliminary work of sewage treatment facilities projects in Jiufeng Town, Mouzi Town, Suji Town, and Shuikou Town has been completed in the Shizhong District. The sewage treatment facility project in Shuikou Town has entered the construction site, and the remaining three towns are expected to start construction by the end of this month. Among them, Suji Town will be completed by the end of October, and Jiufeng Town and Mouzi Town will be completed by the end of the year. At the same time, relevant departments are actively accelerating the renovation of sewage pipe networks in self built residential areas and old residential areas within the jurisdiction of six street offices, including Zhanggongqiao and Boshui Street in the central district of the city. At present, the sewage pipe network renovation projects of Zhanggongqiao and Tongjiang Street Offices (Wanren Community) have entered the construction site. The remaining four street offices plan to start construction before the end of this month, and the six sewage pipe network renovation projects will be fully completed by the end of the year.
Linjiang Dental Medical Sewage Treatment Plant
