Pipeline detection servicePreparation work before construction
Before starting the underground pipeline measurement, the following steps need to be performed:
1. Communication and requirement confirmation: Effectively communicate with the client, understand the real requirements, and ensure accurate understanding of project requirements
2. Technical design document: Develop a detailed technical design document, including detection methods, instruments and equipment, measurement record sheets, etc., to ensure the workflow
The clarity and consistency of Cheng.
3. Technical adaptability training: Provide technical adaptability training to personnel involved in construction to improve their operational skills in practical work
4. On site survey: Conduct on-site surveys to familiarize oneself with the terrain, landforms, and site conditions, and prepare for subsequent work
5. Instrument and equipment calibration: Verify the instruments and equipment used to ensure their normal operation and accuracy