-
E-mail
jinyaru@nangang-power.com
- Phone
-
Address
Room 1016, Lijing Building, 1008 Hongling Middle Road, Luohu District, Shenzhen
Shenzhen Nangang Power Engineering Co., Ltd
jinyaru@nangang-power.com
Room 1016, Lijing Building, 1008 Hongling Middle Road, Luohu District, Shenzhen
The unit is an outdoor quick installation unit, and the unit body is a sub assembly structure with a chassis, divided into four parts: control, gas turbine, load gearbox, and generator. The gas turbine control panel, generator control panel, generator protection panel, and motor control center are installed in the gas turbine control room. The neutral point chamber and outlet chamber of the generator are located on both sides of the generator. The gas turbine generator set adopts a closed casing and has corresponding ventilation, lighting, and fire protection systems. The control room is equipped with air conditioning.
1. MS6001B gas turbine
The MS6001B gas turbine is mainly composed of an intake system, compressor, combustion chamber, turbine, exhaust system, auxiliary system, and control system. (See Figure 1).
Air enters the compressor through the intake filter and muffler, and is compressed by the compressor before entering the combustion chamber. Fuel (heavy oil, diesel, or natural gas) is sprayed into the combustion chamber from the fuel nozzle and mixed with the compressed air in the combustion chamber to produce high-temperature and high-pressure gas, which then enters the turbine for expansion and work. Finally, it is discharged into the atmosphere (or waste heat boiler) through the exhaust system.

Figure 1: MS6001B gas turbine started by diesel engine

Figure 2: Gas turbine generator