- Phone
-
Address
Room 502, Building 114, Lane 351, Dong'an Road, Xuhui District, Shanghai
Shanghai Caiyun Trading Co., Ltd
Room 502, Building 114, Lane 351, Dong'an Road, Xuhui District, Shanghai
| rapid detection | Regardless of the size of the leakage hole, detect and locate the leakage point within 100 seconds |
| precise positioning | Less than 50m |
| reliability | *A system that can be connected to an automatic control valve for shut-off operation |
| sensitivity | Liquid pipeline detection is less than 0.1% of the flow rate, approximately less than 0.1 inches |
| Gas pipeline detection less than 0.001% flow rate | |
| Background noise and sensor bandwidth, as well as sensor layout, need to be considered | |
| working conditions | Normal operation in the following situations: pump start-up and shutdown, valve opening and closing, static and non static flow, non full flow, no flow, etc |
| location | type | time | description |
| Colorado | Gas pipeline | 1980year | The system was connected to an automatic control valve, during which the pipeline ruptured due to a landslide. The system successfully closed the pipeline automatically, reducing gas loss |
| GermanyShell / ESSOcompany | Sulfur containing gas pipeline network | 1990 | The leak detection system successfully detected the test leak point during installation |
| AustraliaTHESEcompany | LPG | 1999 | Due to the sealing failure of the liquefied petroleum pump in the middle section of the pipeline, the system detected and automatically closed the isolation valve along the pipeline. |
| AustraliaTHESEcompany | LPG | 2000 | Accidental puncture by fiber optic cable laying personnelLPGPipeline, system in60sInternal detection of leaks and automatic closure of pipelines, followed by100mLocate the leakage point within the range. |
| Columbia Oil CompanyGCproject | refined oil | 2003 | Multi product transportation pipelines, including gasoline, diesel, jet fuelLPGWait. The system has been successful multiple times50sDetected internally6mmLeakage, positioning accuracy is±35mWithin. And successfully detected multiple theft incidents. |
| Columbia Oil CompanyGSproject | refined oil | 2004 | Parallel pipelines480km |