List of Quality Testing Instruments and Equipment for Water Conservancy Engineering

NegotiableUpdate on 05/15
Model
Nature of the Manufacturer
Producers
Product Category
Place of Origin

Overview

List of Quality Testing Instruments and Equipment for Water Conservancy Engineering, List of Grade A and B Qualification Testing Instruments and Equipment for Water Conservancy Engineering Quality Testing Units, and Complete Configuration List of Grade A and B Qualification Testing Instruments and Equipment for Water Conservancy Engineering Quality Testing Institutions. Note: Longhui Company can customize a complete set of water conservancy engineering quality testing instruments and equipment according to the needs of different customers. The qualifications of water conservancy engineering quality inspection units are divided into five categories: geotechnical engineering, concrete engineering, metal structure, mechanical and electrical engineering, and measurement. Each category is divided into two levels: Class A and Class B.

Product Details

List of Quality Testing Instruments and Equipment for Water Conservancy EngineeringList of Standard Configuration for Water Conservancy Engineering Quality Testing Instruments and Equipment, List of Configuration for Water Conservancy Engineering Quality Testing Instruments and Equipment, List of Testing Instruments and Equipment for Water Conservancy Engineering Quality Supervision and Testing Stations, List of Configuration for Quality Testing Instruments and Equipment for Water Conservancy Engineering Quality Safety Supervision Stations, List of Standard Configuration for Geotechnical Engineering Instruments and Equipment for Water Conservancy Engineering Quality Testing Institutions, List of Testing Instruments and Equipment for Grade A and B Qualifications of Water Conservancy Engineering Quality Testing Units, List of Testing Instruments and Equipment for Water Conservancy Engineering Quality Testing Institutions, List of Testing Instruments and Equipment for Water Conservancy Engineering Quality Testing Companies, Direct Sales from Water Conservancy Engineering Quality Testing Instrument and Equipment Manufacturers, Origin of Water Conservancy Engineering Quality Testing Instrument and Equipment, Manufacturer of Water Conservancy Engineering Quality Testing Instrument and Equipment, Price of Water Conservancy Engineering Quality Testing Instrument and Equipment, Water conservancy engineering quality testing instruments and equipment (complete configuration list), water conservancy engineering quality testing instruments and equipment (new standard configuration list)

The qualifications of water conservancy engineering quality inspection units are divided into five categories: geotechnical engineering, concrete engineering, metal structure, mechanical and electrical engineering, and measurement. Each category is divided into two levels: Class A and Class B.

Note: Longhui Company can customize a complete set of water conservancy engineering quality testing instruments and equipment according to the needs of different customers.
List of Quality Testing Instruments and Equipment for Water Conservancy Engineering: (Please contact us for details)

Serial number, instrument and equipment name, model, specifications, technical indicators, unit quantity, remarks
1. Microcomputer controlled electronic universal testing machine WDW-1000 maximum test force: 1000kN measurement range: 0-200kN: 0-500kN: 0-1000kN indication accuracy: ± 1% Table 1 Reinforcement strength, elongation, bending test
2. Microcomputer controlled electronic universal testing machine WDW-600 maximum test force: 600kN measurement range: 0-600kN indication accuracy: Level 1 platform 1
3. Microcomputer controlled electronic universal testing machine WDW-300 maximum test force: 300kN measurement range: 0-60kN: 0-150kN: 0-300kN indication accuracy: ± 1% per unit

4. Electric hydraulic pressure testing machine TYE-2000 maximum test force: 2000 kN indication accuracy: ± 1% test block strength
5. Cement constant stress pressure testing machine NYL-300D maximum test force 300 kN indication accuracy ± 1% platform 1 cement detection
6. Electric bending tester DKZ-6000 maximum test force: 1000N for horizontal bars: 6000N for parallel bars, indication accuracy: ± 1%, table 1
7. Cement sand compaction table ZS-15 amplitude: 15mm vibration frequency: 60cycle/60s vibration time: 2min table 1

8. Cement slurry mixer NJ-160A unit 1

9. Cement mortar mixer JJ-5 unit 1

10. Cement standard constant temperature and humidity curing box SHBY-40B temperature control accuracy ± 1 ℃ humidity control range ≥ 95% set 1
11. Standard viscosity and setting time tester (Vicat apparatus) new standard platform 1
12. Cement fineness negative pressure sieve analyzer with 3 FSY-150B screens. Negative pressure adjustable range: 4000-6000Pa. Sieve analysis test fineness: 80um. Sieve analysis self-control time: 2 minutes. Table 1
13. Cement mortar flowability tester (jumping table) with a vibration frequency of 25 times per unit 1
14. Automatic controller BYS - Ⅱ in standard curing room Temperature control range: 0~50 ℃ Accuracy: ≤ 20 ± 2 ℃ Humidity control accuracy: ≥ 95% sets 1 all stainless steel control cabinet, sink, refrigeration, heating, constant temperature water spray
15. Lei's boiling box FZ-31A unit 1 cement testing
16. Lei's clamp tester LD-50 unit 1

17. Lei's clip is only 12

18. Lei's clamp bracket cover 10
19. Digital electric blast drying oven 101-1A stainless steel inner liner, temperature control range 10-300 ℃, temperature control accuracy ± 1 ℃, table 1
20. Electric vibrating screen machine ZBSX-92A unit 1

21. Geotechnical lightweight compaction instrument STJ-1 unit 1

22. Geotechnical heavy-duty compaction instrument STJ-1 set 1

23. The new standard for crushed stone crushing index instrument is made of all steel and has undergone heat treatment on platform 1

24. Mortar Consistency Meter SC-145 Unit 1

25. Forced single horizontal axis concrete mixer SJD-60 unit 1

26. Continuous steel bar gauge 10-40 units 1

27. Soil Relative Density Meter XD-1 Unit 1

28. Concrete compaction platform HZJ-A platform 1

29. Square hole sand and gravel sieve 0.075-10mm set 1

30. Square hole stone sieve 5-80mm set 1

31. Capacity bucket 1-50L, only 1

32. Concrete test mold 150 × 150 × 150

33. Triple mortar test mold 70.7 × 70.7 × 70.7mm group 4

34. Cement sand test mold 40 × 40 × 160mm group 4

35. Steel bar cold bending punch with various specifications of ф 6~ф 125 sets 1

36. Cement compression fixture 40mm × 40mm 1

37. Cement anti bending fixture 40 × 40 × 160mm 1

38. Needle and sheet gauge with hole width of 3.0~14.0mm and hole length of 18~85.8mm per piece

39. Slump cone 100 × 100 × 300mm

40. Cement standard sand ISO bag 2

41. Cement sample bucket 38 × 30 × 25 mechanism, stamping only 20

42. Platform scale 100kg platform 1

43. Temperature gauge 0~50 ℃, division value 0.1 ℃, only 1

44. Electronic precision balance JM10001; 1kg/0.01g per unit 1

45. Electronic precision balance 220g/0.1mg platform 1

46. Balance 5kg/0.1g set 1

47. Muffle furnace 1000 ℃ platform 1

48. Vernier caliper 300mm/0.02 hold 2

49. Steel ruler handle 1

50. 500ml volumetric flask, 10 pieces each
51. Electronic scale 30kg, division value 1g, platform 1

52. The display error of the digital concrete penetration resistance meter is ≤± 1%, with a maximum penetration force of 1000N per unit

53. Concrete Air Content Tester HC-7L Platform 1

54. Acidity meter table 1

55. Refrigerator stand 1
56. Hydraulic jack

57. Load cell ≤ 1%
58. Load sensor (or precision pressure gauge) 0.4 level only 10
59. The range of the dial gauge is greater than 30mm, the measurement error is not greater than 0.1% FS, and the resolution is better than or equal to 0.01mm. Only 10

60. Beam reaction device

61. High strain detector

62. Reference cement bag 2

63. 8 broken geotechnical knives

64. Aluminum discs, 6 pieces

65. Soil screening sleeve 1

66. Shallow Plate Large Only 5

67. Shallow Plate Small Only 5

68. Iron shovel handle 2

69. Iron plate block 1

70. One sand filling cylinder

71. Aggregate capacity cylinder of various specifications (1L, 5L, 10L, 20L, 30L) set 1

72. Glass dryer only 1

List of Testing Instruments and Equipment for Water Conservancy Engineering Quality Inspection InstitutionsList of Quality Testing Instruments and Equipment for Water Conservancy EngineeringList of standard configuration of water conservancy engineering quality testing instruments and equipment, list of A-level qualification testing instruments and equipment for water conservancy engineering quality testing units, list of testing instruments and equipment for water conservancy engineering quality supervision and testing stations, list of configuration of quality testing instruments and equipment for water conservancy engineering quality safety supervision stations, list of standard configuration of geotechnical engineering instruments and equipment for water conservancy engineering quality testing institutions, list of testing instruments and equipment for water conservancy engineering quality testing companies, direct sales of water conservancy engineering quality testing instruments and equipment manufacturers, origin of water conservancy engineering quality testing instruments and equipment, price of water conservancy engineering quality testing instruments and equipment (complete configuration list)

List of Quality Testing Instruments and Equipment for Water Conservancy Engineering: (Please contact us for details)

serial number Product Name model quantity
1 Concrete pressure testing machine DYE-2000type 1
2 Cement constant stress pressure testing machine DYE-300S type 1
3 Concrete horizontal mixer HJW-60type 1
4 Concrete penetration resistance meter HG-1000type 1
5 Concrete rebound tester ZC3-Atype 1
6 Concrete vibration table 1 square meter 1
7 Concrete shrinkage expansion meter HSP-355/540type 1
8 Concrete Air Content Tester HC-7Ltype 1
9 Electric bending tester DKZ-5000type 1
10 Anti bending fixture 1
11 Concrete impermeability tester HP-40 type 1
12 Cement standard constant temperature and humidity curing box YH-40Btype 1
13 Cement sand mixer JJ-5type 1
14 Cement mortar compaction table ZT-96type 1
15 Cement slurry mixer NJ-160Btype 1
16 Cement binder flowability tester NLD-3type 1
17 Shock standard vibrating screen machine ZBSX-92Atype 1
18 Sand sieve; Stone sieve new standard 1
19 Stone crusher 1
20 Needle like standard instrument 1
21 All stainless steel disc 300X400 2
22 All stainless steel disc 200X300 2
23 Volume increase 1-30 liters 1
24 Electronic analytical balance 200g /0.0001g 1
25 Electronic scale 100kg 1
26 Concrete pressure bleeding meter SY-2type 1
27 air compressor 1
28 Concrete trial mold (plastic) 150X150 48
29 Concrete triple test mold (plastic) 100X100 20
30 Concrete anti-seepage mold (plastic) 150X175X185 18
31 Concrete elastic test mold (plastic) 50X150X300 6
32 vernier caliper 1
33 Cement negative pressure screening instrument FYS-150type 1
34 Negative pressure sieve 0.08 1
35 Negative pressure sieve 0.045 1
36 electronic platform scale 2000g-0.1g 1
37 Water dispenser 225ml 1
38 hydrometer 1.100-1400 1
39 pH meter Phs 25-0.1 1
40 balance 5kg/0.1 1
41 box-type resistance furnace 1000 degrees 1
42 porcelain crucible 30CC 1
43 crucible tongs 1
44 dryer 1
45 color-changing silica gel 1
46 Electric hot blast constant temperature drying oven 101-2Atype 1
47 Measuring cylinder 500ml; 250ml; 100ml 2
48 Beaker 100ml; 150ml; 200ml; 500ml; 1000ml 2
49 wide-mouth bottle 1000ml 1
50 dropper Short; long 2
51 volumetric flask 500ml 2
52 thermometer 0-100 degrees 2
53 Le Chatelier Flask 2
54 thermometer 0-300° 10
55 Dry wet thermometer 3
56 weighing bottle 40x25 2
57 Cement sample bucket 30
58 Standard sand 25
59 Maintenance room control device 1
60 steel ruler 0-300mm 1
61 Demoulding gun 2
62 Stainless steel enamel shovel 2
63 Sand funnel 1
64 Stone funnel 1
65 Mortar expansion rate tester 1
66 graduated cylinder 1000ml 2
67 Lei's clamp tester LD-50type 1
68 New standard Vicat apparatus 1
69 Lei's clip 12
70 Lei's clip attachment 1
71 Rubber sand trial mold 40x40x160 5
72 Pressure resistant fixture 40x40 1
73 Digital Burgers specific surface area measuring instrument FBT-9type 1
74 Lei's boiling box FZ-31Atype 1
75 Stopwatch 1

Qualifications of water conservancy engineering quality inspection units, metal structure testing projects, and testing instruments:

List of Grade A and Grade B qualification testing instruments and equipment for water conservancy engineering quality testing units, and complete configuration list of Grade A and Grade B qualification testing instruments and equipment for water conservancy engineering quality testing units

The qualifications of water conservancy engineering quality inspection units are divided into five categories: geotechnical engineering, concrete engineering, metal structure, mechanical and electrical engineering, and measurement. Each category is divided into two levels: Class A and Class B.

Requirements for Class A Testing Capability of Metal Structures:

Metal Structure Class A:

(1) 10 items for quality inspection of casting, forging, welding, material and anti-corrosion coating

External quality of castings and forgings, internal quality of castings and forgings, appearance quality of welds, internal quality of welds, mechanical property tests of metal materials, surface cleanliness, coating quality, metal coating quality, corrosion testing, coating quality testing

(2) 11 quality inspections for manufacturing and installation

Conventional size and position detection, surface defect depth, temperature, humidity, deformation, wear, vibration frequency, amplitude, angle, rubber hardness, water pressure test

(3) 17 tests for various types of opening and closing machines and cleaning machines

Electrical testing, door opening force, door closing force, holding force, wire rope testing, Leeb hardness, camber, deflection, oil viscosity, stroke, pressure, time, surface roughness, overall operational testing, load testing, type testing

Metal Structure Class B

(1) 5 items for quality inspection of casting, forging, welding, material and anti-corrosion coating

External quality of castings and forgings, appearance quality of welds, internal quality of Class II welds, surface cleanliness, and coating quality of coatings

(2) Six quality inspections for manufacturing and installation

Conventional size and position detection, surface defect depth, temperature, humidity, angle, water pressure test

(3) 8 tests for various types of opening and closing machines and cleaning machines

Wire rope testing, Leeb hardness, main beam camber, uplift, deflection, stroke, pressure, time

category

Main testing items and parameters

mix

condense

earth

work

Cheng

class

Class A

(1) Cement 8 items

Fineness, water consumption for standard consistency, setting time, stability, flowability of mortar, mortar strength, specific surface area, loss on ignition

(2) 7 items of fly ash

Strength ratio, water demand ratio, fineness, stability, loss on ignition, sulfur trioxide content, uniformity

(3) 13 items of concrete aggregates

Particle size distribution, moisture content, mud content, bulk density, apparent density, needle like particle content, weak particle content, crushing index, alkali activity, sulfide content, softening material content, mica content, super coarse particle size

(4) Concrete 18 items

Slump of the mixture, bleeding rate of the mixture, uniformity of the mixture, air content of the mixture, temperature, setting time of the mixture, water cement ratio of the mixture, compressive strength, tensile strength, flexural strength, elastic modulus, impermeability, spacing between steel bars, thickness of steel bar protective layer, carbonation depth, rebound value, ultrasonic defect measurement

(5) 7 items of steel bars

Tensile strength, yield strength, elongation, cold bending performance, welding performance, hardness, bending

(6) 6 items of mortar

Consistency, bleeding rate, density, air content, compressive strength, impermeability

(7) 11 additives

Water reduction rate, solid content, moisture content, gas content, pH value, fineness, chloride ion content, * content, flowability, shrinkage ratio, limited expansion rate

(8) Asphalt 6 items

Density, relative density, penetration, ductility, softening point, brittle point

Class B

(1) Cement 6 items

Fineness, water consumption for standard consistency, setting time, stability, flowability of adhesive sand, adhesive sand strength

(2) 8 items of concrete aggregates

Particle size distribution, moisture content, mud content, bulk density, apparent density, needle like particle content, crushing index, weak particle content

(3) Concrete 9 items

Slump of the mixture, bleeding rate of the mixture, uniformity of the mixture, gas content of the mixture, temperature, setting time of the mixture, water cement ratio of the mixture, compressive strength, tensile strength

(4) 6 items of steel bars

Tensile strength, yield strength, elongation, cold bending performance, welding performance, bending performance

(5) 5 items of mortar

Consistency, bleeding rate, density, air content, compressive strength

(6) 6 additives

Water reduction rate, solid content, gas content, pH value, fineness, flowability

category

Main testing items and parameters

Measurement category

Class A

30 measurement items

Elevation, plan position, building longitudinal and transverse axes, geometric dimensions of building cross-sections, geometric shapes of concealed buildings, geometric dimensions of structural components, radians, lengths, widths, thicknesses, depths, heights, slopes, flatness, horizontal displacement, vertical displacement, vibration frequency, acceleration, velocity, joint and crack opening, inclination, seepage volume, uplift pressure, seepage pressure, pore water pressure, temperature, stress, strain, groundwater level, soil pressure

Class B

22 measurement items

Elevation, plan position, building longitudinal and transverse axes, geometric dimensions of building sections, geometric dimensions of structural components, length, width, thickness, depth, height, slope, flatness, horizontal displacement, vertical displacement, joint and crack opening, seepage volume, uplift pressure, seepage pressure, pore water pressure, stress, strain, groundwater level

Note: Longhui Company can customize a complete set of water conservancy engineering quality testing instruments and equipment according to the needs of different customers.

Establish length and coordinate benchmarks for quality inspection and measurement of water conservancy engineering:

In order to ensure the length standard of water conservancy engineering construction measurement, it is required that length measuring instruments and tools such as rangefinders and rulers should be regularly and comprehensively calibrated and used within the validity period of the calibration. For large-scale water conservancy projects, due to the large number of construction units and long construction period, in order to facilitate the calibration of distance measuring instruments, a baseline field can usually be established in the vicinity of the construction site using precision measurement technology and methods. After metrological certification, it can be used as a length benchmark. All length measuring instruments and tools such as rangefinders and rulers used in the project, whether for construction layout measurement, engineering supervision measurement, or quality inspection measurement, must be regularly inspected on the baseline field. For example, the Tumen baseline field near Yichang is the length benchmark for measuring water conservancy projects such as the Three Gorges, Gezhouba, and Geheyan.

The construction control network is the benchmark for construction surveying. One of the purposes of establishing a construction control network is to establish a construction coordinate system at the construction site, and to maintain this coordinate system through the re measurement or expansion of the construction control network during the construction process, providing a unified coordinate benchmark for engineering construction. Of course, this is also the coordinate benchmark for quality inspection and measurement.

Hebei Longhui Highway and Railway Test Instrument Factory mainly produces and supplies:Highway testing instrumentsWater conservancy engineering quality testing instruments and equipmentHighway engineering site laboratory equipment, railway engineering site laboratory equipment, water conservancy engineering comprehensive Class A testing equipment, water conservancy engineering comprehensive Class B testing qualification complete set of testing equipment, Xinjiang highway engineering comprehensive Class C testing qualification complete set of testing equipment, highway testing equipment series, high-speed railway testing equipment, highway project site laboratory testing equipment, commodity concrete mixing plant testing equipment, asphalt mixing plant testing equipment, concrete drilling and coring machine series, fully automatic curing room equipment series, constant temperature and humidity standard curing box series, cement concrete pressure testing machine series, universal material testing machine series, concrete single horizontal axis mixer series, cement electric bending test machine series, electric blast drying box series Concrete freeze-thaw testing machine series, cement testing equipment, concrete testing equipment, asphalt testing equipment, highway testing equipment, geotechnical testing equipment, mortar testing equipment, non-destructive testing equipment. We can set up complete sets of instruments and equipment for first, second, and third level laboratories for our clients and friends (commercial concrete mixing plant instruments and equipment). Our products (excluding vulnerable parts) are covered by a one-year warranty,If there are quality issues within six months (except for user operated reasons), replacement is guaranteed,Lifetime responsibility for maintenance.

Longhui Company specializes in contracting:

A. Design and equipment configuration business for laboratories A, B, and C.

B. Design and equipment configuration business for P1, P2, and P3 level laboratories.

The integrity, strength, and product quality of Hebei Longhui Testing Instrument Factory have been recognized by the industry. Welcome friends from all walks of life to visit, guide and negotiate business. We will be dedicated to serving you.

Regulations on Quality Management of Water Conservancy Engineering: (Order No. 7 of the Ministry of Water Resources)

Regulations on Quality Management of Water Conservancy Engineering

(Order No. 7 of the Ministry of Water Resources)

(Issued by the Ministry of Water Resources on December 21, 1997)

*Chapter General Provisions

*According to the State Council's "Outline for Quality Revitalization (1996-2010)" and relevant regulations, in order to strengthen the quality management of water conservancy projects and ensure project quality, this regulation is formulated.

Article 2: All units (including project legal persons (construction units), supervision, design, construction units, etc.) or individuals engaged in water conservancy engineering construction activities within the territory of the People's Republic of China must comply with these regulations.

Article 3: The water conservancy projects referred to in these regulations refer to various types of water conservancy projects, including flood control, flood control irrigation, hydropower generation, water supply, reclamation, etc. (including supporting and ancillary projects), constructed by national investment, central and local joint ventures, local investment, and other investment methods.

Article 4: The quality of water conservancy projects referred to in these regulations refers to the comprehensive requirements for the safety, applicability, economy, aesthetics, and other characteristics of the constructed water conservancy projects in the current relevant laws, regulations, technical standards, approved design documents, and engineering contracts of the country and the water conservancy industry.

Article 5: The Ministry of Water Resources is responsible for the quality management of water conservancy projects nationwide.

Each basin agency is entrusted by the Ministry of Water Resources to be responsible for the quality management of water conservancy projects under the jurisdiction of the basin agency, and to guide the quality management of local water administrative departments.
The water administrative departments of each province, autonomous region, and municipality directly under the central government are responsible for the quality management of water conservancy projects within their respective administrative regions.

Article 6: The quality of water conservancy projects shall implement a quality management system that combines the responsibility of the project legal person (construction unit), control by the supervision unit, guarantee by the construction unit, and government supervision.

The quality of water conservancy projects is fully responsible by the project legal person (construction unit). The supervision, construction, and design units are responsible for their respective work in accordance with the contract and relevant regulations. Quality supervision agencies fulfill the supervisory functions of government departments and do not replace the quality management work of project legal persons (construction units), supervisors, designers, and construction units. All parties involved in water conservancy engineering construction have the responsibility and right to report engineering quality issues to relevant departments and quality supervision agencies.

Article 7: The responsible persons of the legal person (construction unit), supervision, design, construction and other units of water conservancy projects shall take leadership responsibility for the quality work of their respective units. The project leaders of each unit at the construction site are directly responsible for the quality work of their unit at the construction site. The engineering and technical leaders of each unit are responsible for the technical aspects of quality work. The specific staff is the direct responsible person.

Article 8: All units of water conservancy engineering construction shall actively promote comprehensive quality management, adopt * quality management mode and management methods, promote * scientific technology and construction technology, rely on scientific and technological progress and strengthen management, strive to create high-quality projects, and continuously improve project quality.

Water administrative departments at all levels should reward units and individuals who have made contributions to improving engineering quality.

Article 9: Each unit of water conservancy engineering construction shall strengthen the education of quality control system, enhance the concept of quality legal system, regard improving the quality of workers as an important link to improve quality, strengthen the education of quality awareness and management knowledge of management personnel and employees, establish incentive mechanisms for quality management, and actively carry out mass quality management and rationalization suggestion activities.

Chapter 2 Engineering Quality Supervision and Management

Article 10: The government shall establish a system for supervising the quality of water conservancy projects.

Water conservancy projects are subject to quality supervision by quality supervision agencies authorized by the corresponding water administrative authorities in accordance with the principle of hierarchical management.

Article 11: Quality supervision institutions for water conservancy projects must be established in accordance with relevant regulations of the Ministry of Water Resources, and can only undertake quality supervision work for water conservancy projects after passing the qualification review of the water administrative department at or above the provincial level. Longhui Instrument

Quality supervision agencies at all levels of water conservancy projects must establish and improve quality supervision mechanisms, supervision methods, and enhance the authority and effectiveness of quality supervision.

Quality supervision agencies at all levels of water conservancy projects should strengthen inspections on the implementation of relevant quality regulations and norms by the state and the Ministry of Water Resources, and resolutely investigate and punish behaviors such as non-compliance with laws, lax law enforcement, failure to investigate violations, and abuse of power.

Article 12: The water conservancy engineering quality supervision agency of the Ministry of Water Resources is responsible for the unified planning, management, and qualification review of basin agencies, provincial-level water conservancy engineering quality supervision agencies, and water conservancy engineering quality inspection units.

The water conservancy engineering quality supervision institutions established by each province, autonomous region, and municipality directly under the central government are responsible for the unified planning, management, and qualification review of water conservancy engineering quality supervision institutions and water conservancy engineering quality inspection units below the provincial level within their administrative regions.

Article 13: Water conservancy engineering quality supervision institutions are responsible for supervising the quality work of design, supervision, and construction units engaged in water conservancy engineering construction within the scope of their qualification levels; Responsible for inspecting and supervising the establishment and improvement of quality systems by construction, supervision, design, and construction units.

The water conservancy engineering quality supervision agency shall implement engineering quality supervision in accordance with relevant national and water conservancy industry construction regulations, technical standards, and design documents, and supervise and inspect behaviors that affect engineering quality on the construction site.

Article 14: The quality supervision of water conservancy projects shall be mainly carried out through spot checks, and legal and administrative means shall be used to handle the handling work after supervision and spot checks. When the project is completed and accepted, the quality supervision agency should verify the quality level of the project. Projects that have not been approved for quality or are deemed unqualified shall not be submitted for inspection by the construction unit, accepted by the engineering supervisory department, or put into use.

Article 15: As needed, quality supervision agencies may entrust qualified testing units certified by metrology to conduct sampling tests on relevant parts of water conservancy projects, as well as the building materials and engineering equipment used.

The data issued by the water conservancy engineering quality inspection agency recognized by the water conservancy engineering quality supervision agency of the Ministry of Water Resources is the final inspection of the national water conservancy system.

The testing data issued by the water conservancy engineering quality inspection institutions recognized by the provincial water conservancy engineering quality supervision agencies is the highest testing of the water conservancy system in this administrative region.

Chapter 3 Quality Management of Project Legal Person (Construction Unit)

Article 16: The project legal person (construction unit) shall be established in accordance with relevant regulations of the state and the Ministry of Water Resources, and actively accept the supervision and inspection of its quality system by the water conservancy engineering quality supervision agency.

Article 17: The project legal person (construction unit) shall, based on the scale and characteristics of the project, select survey and design, construction, and supervision units through qualification review and bidding in accordance with relevant regulations of the Ministry of Water Resources, and implement contract management. In the contract documents, there must be engineering quality clauses that clarify the quality standards of drawings, data, engineering, materials, equipment, etc., as well as the quality responsibilities of both parties to the contract.

Article 18: The project legal person (construction unit) shall strengthen engineering quality management, establish and improve the construction quality inspection system, and establish quality management institutions and systems based on the characteristics of the project.

Article 19: The project legal person (construction unit) shall handle the engineering quality supervision procedures with the water conservancy engineering quality supervision agency in accordance with regulations before the commencement of the project. During the construction process, it is necessary to actively accept the supervision and inspection of the project quality by the quality supervision agency.

Article 20: The project legal person (construction unit) shall organize the design and construction units to conduct design disclosure; During construction, the quality of the project should be inspected. After the completion of the project, relevant units should be organized in a timely manner for project quality acceptance and certification.

Chapter 4 Quality Management of Supervision Units

Article 21: The supervision unit must hold a qualification certificate for supervision units issued by the Ministry of Water Resources, and undertake the supervision tasks of corresponding water conservancy projects in accordance with the approved supervision scope. The supervision unit must accept the supervision and inspection of its supervision qualification quality inspection system and quality supervision work by the water conservancy engineering quality supervision institution.

Article 22: The supervision unit must strictly comply with national laws, water conservancy industry regulations, and technical standards, and strictly fulfill the supervision contract.

Article 23: The supervisory unit shall dispatch corresponding supervisory agencies to the construction site of water conservancy projects according to the supervisory tasks it undertakes, and the personnel allocation must meet the project requirements. Supervising engineers must hold a supervising engineer position certificate issued by the Ministry of Water Resources before taking up their posts, and general supervising personnel must undergo pre job training before taking up their posts.

Article 24: The supervisory unit shall participate in the bidding work in accordance with the supervision contract, and issue construction drawings from the perspective of ensuring the quality of the project and fully fulfilling the construction contract; Review the construction organization design and technical measures of the construction unit; Guide and supervise the implementation of quality standards and requirements in the contract; Participate in engineering quality inspections, investigation and handling of engineering quality accidents, and engineering acceptance work.

Chapter 5 Quality Management of Design Units

Article 25: Design units must undertake survey and design tasks according to their qualification level and business scope, and should actively accept supervision and inspection of their qualification level and quality system by water conservancy engineering quality supervision institutions.

Article 26: Design units must establish and improve a design quality assurance system, strengthen quality control in the design process, establish a sound system for reviewing and approving design documents, and carry out technical disclosure of design documents.

Article 27: Design documents must meet the following basic requirements:
(1) The design documents shall comply with the requirements of relevant national and water conservancy industry engineering construction regulations, engineering survey and design technical specifications, standards, and contracts.
(2) The basic information of the design basis should be complete, accurate, and reliable, the design argumentation should be sufficient, and the calculation results should be reliable.
(3) The depth of the design documents should meet the relevant requirements of the design stage, and the design quality must meet the engineering quality, safety needs, and comply with the requirements of the design specifications.

Article 28: The design unit shall provide design documents and construction drawings in a timely manner in accordance with the contract provisions. During the construction process, it shall keep abreast of the construction site situation, optimize the design, and solve relevant design problems. For large and medium-sized projects, the design unit shall establish a design representative office or dispatch design representatives at the construction site in accordance with the contract provisions.

Article 29: Design units shall provide evaluation opinions on whether the construction quality meets the design requirements during stage acceptance, unit project acceptance, and completion acceptance in accordance with relevant regulations of the Ministry of Water Resources.

Chapter 6 Quality Management of Construction Units

Article 30: Construction units must undertake construction tasks according to their qualification level and business scope, and accept supervision and inspection of their qualifications and quality assurance system by water conservancy engineering quality supervision institutions.

Article 31: Construction units must carry out construction in accordance with relevant national and water conservancy industry regulations, technical specifications, technical standards, as well as the requirements of design documents and construction contracts, and be responsible for the quality of their construction projects.

Article 32: Construction units shall not subcontract the main works of the water conservancy construction projects they undertake. For the subcontracting of projects, the subcontracting unit must have the corresponding qualification level and be responsible to the general contracting unit for the construction quality of its subcontracted projects. The general contracting unit is responsible to the project legal person (construction unit) for all project quality. Engineering subcontracting must be approved by the project legal person (construction unit).

Article 33: The construction unit shall implement comprehensive quality management, establish and improve a quality assurance system, formulate job quality standards, quality responsibilities, and assessment methods, and implement a quality responsibility system. During the construction process, it is necessary to strengthen quality inspection work, conscientiously implement the "three inspection system", and effectively control the entire process of project quality.

Article 34: In the event of a quality accident in a project, the construction unit must report to the supervision unit, the project legal person (construction unit), and relevant departments in accordance with relevant regulations, protect the site, accept the investigation of the engineering quality accident, and handle the accident seriously.

Article 35: The quality of completed projects must comply with the current engineering standards and design document requirements of the state and the water conservancy industry, and complete technical files, test results, and relevant information should be submitted to the project legal person (construction unit).

Chapter 7 Quality Management and Engineering Warranty of Building Materials and Equipment Procurement

Article 36: The quality of building materials and engineering equipment shall be the responsibility of the purchasing unit. All building materials and engineering equipment entering the construction site shall be inspected in accordance with relevant regulations. Products that fail inspection shall not be used in engineering.

Article 37: The purchasing units of building materials and engineering equipment have the right to independently purchase in accordance with the contract provisions, and other units or individuals shall not interfere.

Article 38: Building materials or engineering equipment shall meet the following requirements:

(1) There is a product quality inspection certificate of qualification;
(2) Product name, manufacturer name, and address indicated in Chinese;
(3) The product packaging and trademark style comply with relevant national regulations and standard requirements;
(4) Engineering equipment should have detailed product manuals, and electrical equipment should also be accompanied by circuit diagrams;
(5) Products that implement production licenses or quality certifications should have corresponding licenses or certification certificates.

Article 39: The warranty period for water conservancy projects shall generally not be less than one year from the completion date stated in the project handover certificate. The warranty period for projects with special requirements is specified in the contract.

If there are permanent defects in the engineering quality, the period of responsibility shall not be limited by the above warranty period.

Article 40: If there are any quality problems with water conservancy projects during the prescribed warranty period, the original construction unit shall generally bear the warranty, and the required expenses shall be borne by the responsible party.

Chapter 8 Penalty Provisions

Article 41: In case of major engineering quality accidents in water conservancy projects, they shall be dealt with seriously. Notify and criticize the responsible units, lower their qualification levels, or confiscate their qualification certificates; Administrative disciplinary action shall be imposed on the responsible person, and if the offense constitutes a crime, it shall be transferred to the judicial authorities for handling.

Article 42: If a water conservancy engineering quality accident causes personal injury or property damage, the responsible unit shall provide economic compensation to the damaged party in accordance with relevant regulations.

Article 43: If the project legal person (construction unit) engages in any of the following behaviors, its competent department shall issue a notice of criticism or other disciplinary measures.

(1) Failure to select survey, design, construction, and supervision units with corresponding qualification levels according to regulations;
(2) Failure to follow the prescribed procedures for engineering quality supervision;
(3) Carrying out the next stage of construction without timely acceptance of completed projects as required, and delivering the project for use without completion or stage acceptance;
(4) Failure to report major engineering quality accidents to relevant departments in a timely manner in accordance with relevant regulations.

Article 44: If survey, design, construction, or supervision units engage in any of the following behaviors, they shall be criticized, downgraded, or even have their qualification certificates confiscated according to the severity of the circumstances. Economic sanctions shall be handled in accordance with the contract provisions. If they violate the law, they shall be dealt with in accordance with relevant national laws:
(1) Undertaking tasks without a license or beyond the qualification level;
(2) Not accepting supervision from water conservancy engineering quality supervision agencies;
(3) Design documents that do not meet the requirements of Article 27 of these regulations;
(4) The completed and delivered project does not meet the requirements of Article 35 of these regulations;
(5) Failure to implement quality warranty as required;
(6) Using untested or unqualified building materials and engineering equipment, or producing shoddy, cutting corners, or forging records during construction;
(7) Failure to report major engineering quality accidents to relevant departments in a timely manner in accordance with relevant regulations;
(8) The water conservancy engineering quality supervision agency has determined that the engineering quality level is unqualified or the project needs to be reinforced or demolished.
Article 45: If a testing unit forges inspection data or forges inspection conclusions, it shall be criticized, its qualification level shall be lowered, and its qualification certificate shall be confiscated according to the severity of the circumstances. Those who cause serious consequences due to forgery shall be dealt with in accordance with relevant national regulations.

Article 46: For quality supervision institutions that fail to conscientiously fulfill their responsibilities for water conservancy engineering quality supervision, the corresponding water administrative department or its higher-level water conservancy engineering quality supervision institution shall issue a notice of criticism, replace the person in charge, revoke authorization, and carry out organizational restructuring.

If the staff engaged in engineering quality supervision fail to enforce the law strictly, violate the law without investigation, abuse their power, or accept bribes, they shall be subject to administrative sanctions by their unit or superior competent department. If a crime is constituted, criminal responsibility shall be pursued in accordance with the law.

Chapter 9 Supplementary Provisions

Article 47: The Ministry of Water Resources is responsible for interpreting these regulations.

Article 48: These regulations shall come into effect from the date of their promulgation.

Xian County Longhui Highway and Railway Test Instrument Factory - After sales Service Objective:

Provide users with continuous, efficient, and fast services, and build a high-quality service brand;
Establish a service network that provides users with specialized, standardized, diversified, and productized services;
● User centered, with user satisfaction as the standard for measuring all work;

After sales service tenet:

● Provide lifelong repair and maintenance services, and be responsible for timely supply of spare parts for life;

Provide technical consultation and services;

New products are provided with free warranty for the entire machine according to the purchase and sales contract;

During the warranty period, no on-site fees, handling fees, labor costs, etc. will be charged, and all damaged parts under normal use will be replaced free of charge;

Outside the warranty period, no on-site fees, handling fees, labor fees, etc. will be charged, only the cost of replacement parts will be charged;

Longhui has an after-sales service guarantee system that covers the after-sales service network of various cities, counties, and districts in China. In case of any quality problems during product use, Longhui after-sales service only needs to be provided, followed by fault confirmation, technical guidance, on-site maintenance, and regular follow-up. Longhui's after-sales service system is completed.

Longhui Company mainly produces and supplies:Electro hydraulic universal material testing machine, electronic universal material testing machine, microcomputer screen display universal material testing machine, electro-hydraulic servo universal material testing machine, universal material testing machine series, highway testing instrument series, high-speed railway testing instrument equipment, highway project site laboratory testing instrument equipmentCommercial concrete mixing plant testing instrumentAsphalt mixing plant testing instruments, concrete drilling and coring machine series, fully automatic curing room equipment series, constant temperature and humidity standard curing box series, cement concrete pressure testing machine series, concrete single axis mixer series, cement electric flexural testing machine series, electric blast drying box series, concrete freeze-thaw testing machine series, cement testing and inspection instruments and equipment, concrete testing and inspection instruments and equipment, asphalt testing and inspection instruments and equipment, highway testing and inspection instruments and equipment, geotechnical testing and inspection instruments and equipment, mortar testing and inspection instruments and equipment, non-destructive testing instruments and equipment. We can set up complete sets of instruments and equipment for first, second, and third level laboratories for our clients and friends (commercial concrete mixing plant instruments and equipment). Our products (excluding vulnerable parts) are covered by a one-year warranty,If there are quality issues within six months (except for user operated reasons), replacement is guaranteed,Lifetime responsibility for maintenance.

Longhui Company specializes in contracting:

A. Design and equipment configuration business for laboratories A, B, and C.

B. Design and equipment configuration business for P1, P2, and P3 level laboratories.

The integrity, strength, and product quality of Hebei Longhui Highway and Railway Testing Instrument Factory have been recognized by the industry. Welcome friends from all walks of life to call, visit, guide and negotiate business. We will be dedicated to serving you.