-
E-mail
deyixm@163.com
-
Phone
13860482272,15980811072
-
Address
No. 7 Jinchang Road, Huli District, Xiamen
Xiamen Deyi Equipment Co., Ltd
deyixm@163.com
13860482272,15980811072
No. 7 Jinchang Road, Huli District, Xiamen
1.Neutral salt spray test(NSS) is applicable to (metals and their alloys, metal coatings (anode and cathode), conversion coatings, anodic oxidation coatings, organic coatings on metal materials);
2.aass(AASS) is particularly suitable for testing decorative coatings of copper+nickel+chromium, or nickel+chromium; It was also found to be suitable for testing aluminum anode coatings;
3Copper accelerated acetate salt spray test(CASS) is suitable for testing decorative coatings of copper+nickel+chromium, or nickel+chromium; It was also found to be suitable for testing aluminum anode coatings;
Large salt spray test chamberWorking principleDue to various factors that affect the corrosion process, such as the formation of protective films, which vary greatly depending on the conditions encountered, there is rarely a direct relationship between salt spray resistance and resistance to other media; So the obtained test results cannot be used as a direct guide for the corrosion resistance of the tested metal material in all applicable environments. Similarly, the performance of different materials in experiments cannot serve as a direct guide for their corrosion resistance in use.
Large salt spray test chamberProduct Album
Large salt spray test chamberParameter specifications
|
product name |
Fully automatic salt spray test chamber, also known asPrecision saline spray tester |
|||
|
Common models |
DEY-200ZD |
|||
|
Sample limitations
|
This experimental equipment prohibits: |
|||
|
Large salt spray test chamberVolume, size, and weight |
||||
|
Nominal internal volume |
800LExcluding the volume of the top sloping roof |
|||
|
Inner box size(mm) |
2000×1200×600 W×H×D(Excluding the height of the sloping roof) |
|||
|
Outer box size(mm) |
make an appointment2700×1500×1500 W×H×D(mm) |
|||
|
Net weight of equipment |
make an appointment400㎏ |
|||
|
Large salt spray test chamberPerformance characteristics |
||||
|
Test environment conditions |
The ambient temperature is+25℃, relative humidity≤85%RHUnder the condition of no sample in the test chamber (unless otherwise specified) |
|||
|
temperature range |
Laboratory temperature range:RT~50℃ |
|||
|
Temperature control performance |
Temperature deviation:±1.0℃ |
|||
|
heating rate |
laboratoryRT→+50℃≤60 min |
|||
|
Experimental conditions |
NSSperhapsAASStest temperature35℃, saturated bucket temperature47℃, spray time1min~9999hAdjustable; |
|||
|
Salt spray deposition amount |
1~2ml/h/80cm2(At least collect)16Hour, take its average) |
|||
|
Spray Pressure |
70~170Kpa |
|||
|
test methodMeet standards |
1) GB/T2423.17-2008/IEC 60068-2-11-1981Salt spray test method2) ASTM.B117-2009Salt spray test |
|||
|
noise |
less than70db(A) (Leaving the box1mGet off the ground1.2Measurement of Rice Everywhere |
|||
|
Large salt spray test chamberProduct Features |
||||
|
Box structure layout
Surface spraying treatment |
The laboratory box is importedPVCPolyethylene board(Taiwan South Asia), thickness8mmDurable temperature at85℃ |
|||
|
Tank cover |
The laboratory sealing cover is importedPVCPolyethylene board(Taiwan South Asia), thickness8mm, made into a top100Angle sealing cover, internal reinforcement treatment, effectively preventing condensation water from dripping onto the surface of the sample during the test and affecting the test results |
|||
|
spray tower |
In order to ensure spray uniformity and spray volume, the equipment uses air atomizing nozzle to fine atomize salt water, and then enters the conical spray tower to evenly distribute to the test space; The height of spray tower can be adjusted to achieve the purpose of precise control of spray volume. The installation position of spray tower is evenly distributed at the bottom of the test area |
|||
|
Spray volume collectorPRODUCT FUNCTION |
The spray volume collector is installed indoors with a diameter of100mmThe size of spray volume can be monitored in real time by the conical funnel of spray. A silicone hose is installed at the bottom of the funnel and connected to the outdoor measuring cylinder to check the size of spray volume in real time and ensure the test accuracy of test samples. collector2One installation location is closer to the spray tower, while the other is farther away from the spray tower. |
|||
|
Heating system |
Laboratory: Using titanium alloy heating tubes and steam heating method,P.I.DControl the heating amount; |
|||
|
brine tank |
usePVCBoard production, with a total capacity of approximately25LThere is a liquid level monitoring port. |
|||
|
Saltwater supply system |
Store the prepared salt solution in a saltwater tank and supply it to the saltwater supply container based on the water level difference. The saltwater supply container is equipped with a water level control switch valve, which automatically controls the upper limit of the water level to maintain a distance from the nozzle. |
|||
|
Air saturated bucket |
The saturated bucket material isSUS304Stainless steel, working temperatureRT~ 63℃ adjustable; heating up time≤60 minIt can achieve automatic water replenishment and has liquid level monitoring and liquid level limit alarm functions. |
|||
|
drain line |
Adopting acid and alkali resistant measuresPVCThe pipeline is used as a drainage pipeline, and the drainage outlet is located behind the laboratory; |
|||
|
Distribution control cabinet |
Distribution board Distribution board, cooling fan The over temperature protector is isolated from the distribution control cabinet and valve room |
|||
|
Valve room |
Water supply solenoid valve, spray solenoid valve, demisting solenoid valve, air saturation pressure tank, spray control valve |
|||
|
Power cord, drainage pipe, and fog pipe |
The power supply cables and main power switch are located behind the electrical control box, and the drainage and fog pipes are located on the back of the test box, Ф48mmMist exhaust hole2One,1/2Inch drainage outlet1One. |
|||
|
heater |
Titanium alloy armored electric heating tube (heated at the bottom of the test chamber)SUS316#Stainless steel armored heating tube (saturated drum) |
|||
|
Other configurations |
Mist collection cylinder 2Support (activity style) Fog collector 2Individual (Activity based) Air atomization nozzle 1cover sodium chloride 2Bottle(500can/Bottle) PHtest paper 1wrap Connecting pipe 1cover Plastic bucket (13L) 1individual exhaust fitting a set Hose Clamp 4only measuring cup 1only |
|||
|
bigType salt spray test chamberSpray systemadvantage |
||||
|
Spray principle |
Adopting Bernoulli principle to absorb saline water and then atomize it;air compressor→Primary oil-water separator→air receiver→pressure reducing valve→Main solenoid valve→Secondary oil-water separator→Saturator→Pressure regulating valve→Spray solenoid valve→Nozzle; |
|||
|
spray nozzle |
Made of special glass material, it can control the size and angle of spray volume |
|||
|
Spray control |
It can run manual spray or set automatic spray according to the program; |
|||
|
Pressure regulation |
Spray pressure is0.07~0.17MpaAdjust the compressed air in two stages to0.2~0.3MPaSecondary adjustment to0.07~0.17MpaSpray pressure so that the spray pressure sprayed from the nozzle is within the specified range |
|||
|
Defogging control |
Can run manual defogging or automatically defogging according to program settings;Compressed air is used to fill the room and then expel the indoor fog, quickly removing the fog |
|||
|
System tuning |
The spray tower is installed on both sides of the top of the laboratory,Uniform fog falling,Adjustable spray volume1~2ml/80cm2·h (16Hourly average quantity) |
|||
|
Large salt spray test chambercontrol system |
||||
|
controller |
Omron JapanE5CCDigital display temperature controller,Control the laboratory temperature and saturation tank temperature |
|||
|
Operation mode |
Fixed value mode, timed start and stop |
|||
|
Setting method |
English menu, button based input |
|||
|
display resolution |
Temperature:0.1℃ |
|||
|
timer |
Digital display timer, unit: seconds, minutes, minutes, hours, ten hours switchable, larger timer9999Hour, smaller timing1second |
|||
|
Setting Range |
Temperature: Adjust according to the operating range of the device's temperature(upper limit+5℃) |
|||
|
Input and control methods |
KType thermocouple (armored)PIDcontrol |
|||
|
control mode |
anti-windupPIDBTCBalanced temperature control method(Temperature testing equipment)Spray time and cycle can be set according to user's standard |
|||
|
Total working hours |
One time accumulator can monitor the total working time of the machine,Cannot be reset to zero |
|||
|
Other configurations |
Power cable:3rush pith(Single phase three wire)cable1Article, about3rice |
|||
|
Large salt spray test chamberProtectorordering instructions |
||||
|
5.1.Power supply section |
Control circuit short-circuit protection fuse |
|||
|
5.2.Chamber |
Upper limit temperature alarm, over temperature protection setter |
|||
|
heater |
Heater anti dry burning device, saturated air tank heater anti dry burning device, heater short circuit and overload protection |
|||
|
Water supply system |
Laboratory water shortage protection, saturated air tank low water level protection |
|||
|
environmental condition
|
Temperature:5℃~30℃ |
|||
|
Large salt spray test chamberworking conditions |
||||
|
power supply |
AC(220±10)V (50±0.5)HzSingle phase three wire |
|||
|
|
The grounding resistance of the protective grounding wire is less than4Ω;TN-SPower supply method orTTPower supply methodRequire users to configure corresponding capacity air or power switches for the equipment at the installation site, and this switch must be independently used for the equipment(Prohibit the use of knife switches or power sockets). |
|||
|
power capacity
|
Higher power:3.8Kw |
|||
|
|
||||
|
Equipment air source |
Equipment gas consumption2m3/hThe customer needs to prepare dry and filtered anhydrous and oil-free compressed air at the customer's site, with air pressure0.4~0.8Mpa |
|||
|
Equipment water supplyINSTALLATION REQUIREMENTS |
The salt water used in the test needs deionized water or distilled water, and the water consumption under continuous spray is about25L/Tian, the preparation of saline solution should be based on the dissolved weight5±1The unit of sodium chloride is95The water quality of the unit should meet the requirement of high conductivity (μ m)S/cm @25℃)10 ;PHprice6.5~7.2; |
|||
|
Spray solvent |
The equipment is equipped with distilled water or deionized water required for spray liquid, and the water consumption is about25L/24hContinuous spray state |
|||
|
Spray solute |
For equipment spray liquid preparationNaClPrepare the solution according to5%Quality ratio calculation needs to be prepared properly |
|||
|
Equipment exhaust |
The exhaust pipe of the equipment needs to be extended to a designated location outdoors, and a hole needs to be opened in the wall near the installation of the equipment to lead out to the outside. The fog exhaust pipe should not accumulate water and should be kept unobstructed with a diameter of Φ60mmThe customer specifies the location for fog removal, and the extension pipe should not exceed3To ensure that the gas is not affected by atmospheric reverse pressure, strong exhaust should be avoided at the end of the exhaust hole to prevent strong airflow inside the test chamber. |
|||
|
Equipment drainage |
The equipment drainage pipeline needs to extend to the outside and ensure that the drainage pipeline is unobstructed. The drainage outlet may be lower than the equipment drainage outlet, and the drainage pipe diameter should be Ø1'The drainage location is specified by the customer (if the underground sewer is not made of metal material, it can be directly discharged into the underground sewer). |
|||