Key points for design and construction of clean workshops in Qingdao
The design and construction of clean rooms is a systematic project, with the core being to meet the strict requirements of various industries for production environment cleanliness, temperature and humidity, pressure difference and other parameters, which must be strictly followedNational standards such as GB 50073-2013 balance compliance, practicality, and energy efficiency, and are widely used in fields such as medicine, electronics, and food.
The design phase should focus on process requirements and clarify them firstISO 1-9 cleanliness levels, reasonable planning of floor layout. Divide clean and non clean areas, design scientific pedestrian and logistics channels, set up purification facilities such as changing buffer rooms and transfer windows to prevent cross contamination. At the same time, the airflow organization is optimized, and the high-grade clean area adopts a unidirectional flow design, equipped with primary, medium, and high-efficiency filters to ensure that the air exchange rate and pressure difference meet the standards. The pressure difference in adjacent areas is controlled within 5-10 Pa. The building materials used are smooth, dust-free, and easy to clean color steel plates and epoxy self flow equality to avoid dust accumulationfourCorner.
Attention should be paid to fine control in the construction process, first sealing the site to reduce dust and strictly controlling the construction environment. Installation of enclosure structureensureVerticality and sealing, with rounded transitions for internal and external corners, and all joints treated with specialized sealant. After the installation of the purification air conditioning system, air leakage detection is required, and after the installation of the high-efficiency filterPAO leak detection ensures filtering effectiveness. Ground construction requires proper preparation of the base layer to avoid hollowing and sanding. Electrical and pipeline installations should be concealed and sealed for protection.
After the completion of construction, strict acceptance is required to test key indicators such as suspended particles, planktonic bacteria, temperature and humidity to ensure compliance with design standards and industry norms. In the future, it is necessary to establish an operation and maintenance system, regularly replace filters, and test environmental parameters to ensure the long-term stable operation of the clean plant. The entire design and construction process requires multi-disciplinary collaboration, balancing construction accuracy and energy-saving requirements, to achieve a dual improvement of clean environment and production efficiency. QingdaoKey points of clean room design and construction