Welcome Customer !

Membership

Help

Beijing Yubang Electric Power Technology Co., Ltd
Custom manufacturer

Main Products:

instrumentb2b>Products

Beijing Yubang Electric Power Technology Co., Ltd

  • E-mail

  • Phone

  • Address

    10th and 11th floors, China Blue Star Building, No. 19 North Third Ring East Road, Chaoyang District, Beijing

Contact Now

Intelligent station area fusion terminal

NegotiableUpdate on 03/13
Model
Nature of the Manufacturer
Producers
Product Category
Place of Origin
Overview
The intelligent convergence terminal YPT230A is a edge computing device that builds the edge architecture of the cloud pipe of the basic intelligent Internet of Things system for low-voltage distribution, and has the functions of edge Internet of Things, equipment status information awareness, power data reading, distribution and transformation monitoring, communication networking, localization analysis and decision-making mechanism. The terminal is designed based on the domestic industrial grade chip SCM701 basic core board, using Docker container technology to achieve horizontal business security isolation; The software adopts an APP based design, which enables flexible deployment of business applications.
Product Details

1The terminal has functions such as transformer monitoring, electricity data collection, energy metering, energy quality management, substation topology recognition, equipment status monitoring, and low-voltage fault analysis.

2The terminal can be connected to the power distribution and marketing main station, and is compatible with and supports the IoT management platform.

3The terminal uses supercapacitors as backup power and is integrated inside the terminal. When the main power supply of the terminal fails, the supercapacitor can automatically and seamlessly engage, and can maintain the normal operation of the terminal and terminal communication module for at least 3 minutes.

4Terminal power interruption ensures that the saved settings are not less than 10At least in the year, the clock is running normally5Year.

5The maintenance free time for supercapacitors shall not be less than 8 Year.

6The terminal can be accessed through Beidou/GPSCollect geographic location information and time synchronization.