- Phone
-
Address
Room 602, No. 482 Xinglinwan Road, Jimei District, Xiamen City
Xiamen Yingyi Automation Technology Co., Ltd
Room 602, No. 482 Xinglinwan Road, Jimei District, Xiamen City
Integrated installation of switch FX1S-14MR-ES
1) Analyze the controlled object and propose control requirements
Detailed analysis of the process and working characteristics of the controlled object, understanding the coordination between the machine, electricity, and liquid of the controlled object, proposing the control requirements of the controlled object for the PLC control system, determining the control scheme, and drafting the design task book.
(2) Determine input/output devices
According to the control requirements of the system, determine all the input devices (such as buttons, position switches, transfer switches, and various sensors) and output devices (such as contactors, solenoid valves, signal indicator lights, and other actuators) required by the system, in order to determine the input/output devices related to the PLC and determine the number of I/O points of the PLC.
(3) Select PLC
The selection of PLC includes the selection of PLC model, capacity, I/O module, power supply, etc., as detailed in Section 2 of this chapter.
(4) Allocate I/O points and design PLC peripheral hardware circuits
1. Allocate I/O points
Draw a connection diagram or correspondence table between the I/O points of the PLC and the input/output devices, which can also be done in step 2.
2. Design PLC peripheral hardware circuits
Draw electrical circuit diagrams for other parts of the system, including the main circuit and control circuits that have not entered the programmable controller.
The electrical schematic diagram of the system is composed of the I/O connection diagram of the PLC and the peripheral electrical circuit diagram of the PLC. So far, the hardware and electrical circuits of the system have been determined.
Integrated installation of switch FX1S-14MR-ES
| P0960AW CP30 | AW51B P61000436240 |
| P0960JA CP40 | AW51B P62060176240 |
| P0961FR CP60 | P0400DA FBM01 |
| P0400DA FBM01 | FCP 270 / ZCP 270 |
| P0400YC FBM02 | P0400HH |
| P0400YD FBM03 | P0400VE |
| P0400YE FBM04 | P0400VP |
| P0400YF FBM05 | P0400VT |
| P0400YG FBM06 | P0400YC FBM02 |
| P0400YH FBM07 | P0400YE FBM04 |
| P0400YJ FBM08 | P0400YG FBM06 |
| P0400YK FBM09 | P0400YV FBM18 |
| P0400YL FBM10 | P0400ZE FBM04 |
| P0400YM FBM11 | P0500RG |
| P0400YN FBM12 | P0500RU |
| P0400YP FBM13 | P0500RY |
| P0400YQ FBM14 | P0700TT |
| P0400YR FBM15 | P0800DA |
| P0400YS FBM16 | P0800DC |
| P0400YT FBM17 | P0800DV |
1783-BMS06SA
1784-PCIC
1783-BMS06SGA
1784-PCICS
1783-BMS06SL
1784-PCIDS
1783-BMS06TA
1784-PKTCS
1783-BMS06TGL
1784-PKTX
1783-BMS10CGA
1784-PKTXD
1783-BMS10CGL
1784-U2CN
1783-BMS10CGN
1784-U2DHP
1783-BMS10CGP
1784-U2DN
1783-BMS10CL
1785-ENET
1783-BMS12T4E2CGNK
1785-L20B
1783-BMS20CGN
1785-L20E
1783-BMS20CGP
1785-L40B
1783-BMS4S2SGA
1785-L40C
1783-ETAP2F
1785-L40C15
1783-HMS16T4CGN
1785-L40E
1783-HMS16TG4CGN
1785-L60B
1783-HMS16TG4CGR
1785-L60L
1783-HMS4C4CGN
1785-L80B
1783-HMS4S8E4CGN
1785-L80C
1783-HMS8S4CGN
1785-L80C15
1783-HMS8TG4CGN
1785-L80E
<p style='margin-top:0px; margin-bottom:1rem; white-space:normal; box-sizing:border-box; font-size:16px; overflow:hidden; color:#212529; font-family:system-ui, -apple-system, 'background-color:#FFFFFF; At present, the talents we have gathered are working together towards this goal. I firmly believe that within 5 years, the NGC architecture will achieve breakthrough success and help industrial mother machines achieve a qualitative leap. ”Mr. Zhu made a resounding statement in his 2025 annual speech.