- Phone
-
Address
Beijing Address: No. 8 Zhongguancun Science Park, Haidian District, Beijing Shandong Head Office: 2-2005 Kaixuan New City, Jingshi Road, Jinan City
Shandong Fuhong Xunfei Electronic Technology Co., Ltd
Beijing Address: No. 8 Zhongguancun Science Park, Haidian District, Beijing Shandong Head Office: 2-2005 Kaixuan New City, Jingshi Road, Jinan City
EASTEA801H1KVA online power frequency machine for EasyTech UPS power supply
Features and advantages:
1. Three in and three out, supporting 380/400/415V, 50/60HZ power grid system
2. Pure online dual conversion type, providing power supply quality suitable for various loads and with high overload capacity
3. Ultra wide input voltage range, suitable for harsh power grid environments
4. Intelligent battery management to extend battery life
5. Large LCD display with both Chinese and English interface, user-friendly human-machine interface
6. Fully digital control system
7. Intelligent full bridge rectifier
8. Full bridge isolated inverter
9. Dual static switch
10. Self diagnosis and self-protection
11. Three phase division, balanced voltage regulation
Scope of application
medium-sizedIDC exchange center room, medium-sized network management system, billing center, bank/securities implementation center, process control application, traffic control SMT、LED、 High speed CNC machining centers, equipment, PCBs, and many other fields.
Technical parameters of three-phase UPS | |||||||||||||||||
model |
|
|
|||||||||||||||
|
3C310KS |
3C315KS |
3C320KS |
3C330KS |
3C340KS |
3C350KS |
3C360KS |
3080 |
3100 |
3120 |
3140 |
3160 |
3200 |
3250 |
3300 |
||
Rated capacity |
|
8KVA |
12KVA |
16KVA |
24KVA |
32KVA |
40KVA |
48KVA |
KVA |
80KVA |
96KVA |
112KVA |
128KVA |
160KVA |
200KVA |
240KVA |
|
communication input |
Working mode and principle |
Online power supply static bypass switch (uninterrupted switching), dual conversion technology, output power supply * isolation |
|||||||||||||||
phase number |
Three phase+N+G |
||||||||||||||||
voltage |
380V ±20% |
||||||||||||||||
frequency |
50HZ±10%,60HZ±5% |
||||||||||||||||
Single phase current (A) |
25 |
33 |
40 |
55 |
71 |
86 |
102 |
133 |
1 |
195 |
226 |
257 |
286 |
366 |
517 |
||
power factor |
0.95 (with input filter) |
||||||||||||||||
soft start |
0-100%5Ses |
||||||||||||||||
phase number |
Three phase+N+G |
||||||||||||||||
Bypass input |
voltage |
380V ±20% |
|||||||||||||||
frequency |
50HZ±5% 60HZ±5% |
||||||||||||||||
Convert time |
Inverter/bypass (overload) 0MS |
||||||||||||||||
DC system |
DC voltage |
384 (12V32 battery) |
384V/396V (12V32 sections, 12V33 sections) |
||||||||||||||
float voltage |
432V |
432/446V |
|||||||||||||||
cut-off voltage |
336V |
336/347V |
|||||||||||||||
Discharge current (A) |
25 |
42 |
56 |
85 |
113 |
141 |
169 |
225 |
282 |
338 |
400 |
457 |
571 |
714 |
857 |
||
charging current |
6A-20A (adjustable) |
||||||||||||||||
communication output |
phase number |
Three phase+N+G |
|||||||||||||||
voltage |
380 ± 1% (steady-state load) |
||||||||||||||||
frequency |
50HZ ± 0.5%, 60HZ ± 0.5% (battery powered) |
||||||||||||||||
power factor |
0.8 (lag) |
||||||||||||||||
output waveform |
sine wave |
||||||||||||||||
Total Harmonic Distortion |
Linear load ‹ 3% Non linear load ‹ 5% |
||||||||||||||||
Instantaneous dynamic load voltage |
‹ ± 4% (jump from 0 to 100%) |
||||||||||||||||
Instant recovery time |
‹10MS |
||||||||||||||||
unbalanced voltage |
Balanced load voltage: ‹ ± 1%, unbalanced load ‹ 3% |
||||||||||||||||
overload capacity |
125%10 min,150%1min,150%200ms |
||||||||||||||||
protect |
UPS overcurrent, short circuit, battery low voltage, over temperature, phase loss |
||||||||||||||||
system instructions |
work efficiency |
91%, 95% (ECO economy mode) |
|||||||||||||||
Computer communication interface |
RS232/RS 422 |
||||||||||||||||
operating temperature |
0-40C |
||||||||||||||||
relative temperature |
30~90% without condensation |
||||||||||||||||
noise |
50db |
55db |
63db |
65db |
68bd |
||||||||||||
structure |
Dimensions (D * W * H) MM |
700*520*1100 |
780*580*1190 |
1000*660*1460 |
1150*900*1500 |
1600*750*1600 |
|||||||||||
|
Weight (KG) |
190 |
230 |
320 |
365 |
440 |
520 |
605 |
850 |
1040 |
1110 |
1250 |
1380 |
1500 |
1600 |
2100 |
|
There should be no external interference, including electrostatic interference and high-frequency interference. The strong current circuit of the equipment and the signal line of the electronic ruler should be separated by cable trays. The electronic ruler should use a forced grounding bracket, and the electronic ruler housing (which can measure the resistance between the end cap screw and the bracket, should be less than 1 resistance) should be well grounded. The signal line should use shielded wire, and the shielded wire should be grounded or connected to the negative pole of the DC power supply at one end of the electrical box. When there is static interference, the voltage measurement of a general multimeter is very normal, but the displayed number jumps; The same phenomenon occurs during high-frequency interference. To verify if there is static interference, use a power cord to short-circuit the cover screw of the electronic ruler to a metal point on the machine. As long as it is short circuited, the static interference will be immediately eliminated.
Solar batteries are the application of 'storage batteries' in solar photovoltaic power generation. Currently, there are four types of batteries used: maintenance free lead-acid batteries, ordinary lead-acid batteries, colloidal batteries, and alkaline nickel cadmium batteries. The widely used solar energy batteries in China are mainly lead-acid maintenance free batteries and gel batteries. These two types of batteries are suitable for reliable solar power systems, especially unmanned workstations, due to their inherent "maintenance free" characteristics and less pollution to the environment.
One is to preheat in advance. Electronic balances usually need to be preheated before use, and the preheating time for each balance is often different. Generally speaking, the higher the accuracy level of the balance, the longer the preheating time required. Preheating can be carried out according to the requirements in the balance user manual, and if necessary, the preheating time can be extended (usually the lower the ambient temperature, the longer the preheating time). In fact, many users use the balance immediately, which cannot guarantee the measuring performance of the balance. Preheating of electronic balance is a key factor related to accuracy. The second is environmental conditions. Environmental conditions are also an important factor affecting the metrological performance of electronic balances. If there is no special temperature limit in the operation manual of the electronic balance, the balance should work normally under the temperature conditions of -1 ℃~4 ℃; If there is a special temperature limit, the balance should operate under the specified temperature conditions; Electronic scales also have requirements for environmental humidity, such as Class I scales requiring a relative humidity of no more than 8%. In order to ensure the quality of floor coating, the correct selection of materials, standardized construction, and reasonable use of materials are fundamental issues. In addition, there are several aspects that need to be taken seriously. By establishing a specialized service and management system or a one-stop service system, as well as scientific design of floor application characteristics, organizing a specialized construction team, correctly mastering and carrying out construction ground surface pretreatment, correct construction, strict quality supervision, etc. Only by forming a joint force from all aspects can we ensure the effectiveness of the floor coating project. For this purpose, experts have specifically introduced the testing standards for floor quality. Paint quality testing instruments can cover product quality testing and coating quality testing, but some equipment and instruments are expensive, and some companies may not be able to purchase them. However, this should not be a reason for quality loss control.