Welcome Customer !

Membership

Help

Taitong Technology (Guangzhou) Co., Ltd
Custom manufacturer

Main Products:

instrumentb2b>Products

Taitong Technology (Guangzhou) Co., Ltd

  • E-mail

    243066324@qq.com

  • Phone

    19924611909

  • Address

    7th Floor, Building 7, Liandong U Valley, No. 8 Zhixin 1st Road, Dagang Town, Nansha District, Guangzhou, China

Contact Now

Composite gas sampling tube T-C

NegotiableUpdate on 01/13
Model
Nature of the Manufacturer
Producers
Product Category
Place of Origin
Overview
The composite gas sampling tube T-C (TC composite sampling tube) is suitable for compounds in the range of C3~C16, and contains 175mg of Tenax Ta and 75mg of graphitized carbon black. At any humidity of 25 degrees Celsius, the sampling volume can reach 2L, and for compounds above C7, the sampling volume can be expanded to 5L.
Product Details

Sampling tube parameters

新建 DOCX 文档_01(1).jpg


Composite gas sampling tube T-CInstructions for Use






TCcompositeSampling tube is suitable forC3~C16Compounds within the scope, containing:175mgofTenaxand75mgGraphitic carbon black. At ambient temperature25The sampling volume can reach at any humidity level2LForC7The sampling volume of the above compounds can be expanded to5L.

ex-factory,Not yet activated. The recommended activation time for the first use is1-2hour

The suggested activation conditions are as follows:

ØActivation temperature:300-320

ØActivate traffic:(N2100ml/min


Resolve your backup advantages

image.png


image.png


Provide technical supportInstallation, debugging, and training

Taitong technical engineers can provide on-site technical guidance and communication. After on-site communication, installation, debugging, and on-site acceptance testing can be carried out within 2 hours. Installation, debugging and acceptance completed, on-site

Provide a solution. Training on usage and operation, after passing the acceptance inspection and being put into operation, regularly organize relevant activities

Personnel undergo training.




Ensure scientific management of delivery time and traceability of production progress


image.png


Quality control

Incoming inspection and control, each finished product is tested and inspected to be qualified before leaving the factory

Layer by layer inspection, the finished product must pass 52 tests and pass the inspection before leaving the factory


image.png


Factory live shot

Legitimate manufacturers provide greater assurance


image.png


CNC machining center

High quality supervision, product development and upgrading capabilities, and customizable activation devices with different functions


image.png

Service Process

image.png


Quickly understand Taitong thermal analysis and find solutions suitable for the industry


image.png