- Phone
-
Address
No. 744, Zhenhai Village, Nanqiao Town, Fengxian District, Shanghai (Warehouse 1)
Shanghai Bozhen Instrument Equipment Manufacturing Factory
No. 744, Zhenhai Village, Nanqiao Town, Fengxian District, Shanghai (Warehouse 1)
High temperature muffle furnace
1600 degree high-temperature muffle furnaceMain technical parameters | ||||||||||||
| ||||||||||||
1、 Temperature control instrument | ||||||||||||
1control mode:PIDControl the temperature rise with a single anti parallel thyristor control output. | ||||||||||||
2. Data display: Digital display instrument, clearly and accurately reflecting timely data. | ||||||||||||
3. Temperature curve: 30 segment programmable control, 30 segment temperature rise and fall program can be set, temperature control accuracy ± 1 ℃. | ||||||||||||
4. Temperature measuring element: B-type thermocouple. | ||||||||||||
2、 Heating element | ||||||||||||
1. Furnace material: using 1800 type high-purity alumina microcrystalline fiber, no powder shedding, balanced temperature field, good insulation performance. | ||||||||||||
2. Heating element: high-quality siliconmolybdenumGreat, uniform temperature field, low energy consumption. Suggested heating rate:15-20℃/Min Max:30℃/Min | ||||||||||||
3、 Functional structure | ||||||||||||
1. Shell structure: Double layered furnace body, equipped with air cooling system, ensuring that the furnace shell is close to room temperature during equipment operation, efficient and energy-saving, and avoiding accidents. | ||||||||||||
2. Temperature control safety: It has over temperature protection, thermocouple protection, and leakage protection functions, ensuring safe and reliable equipment operation. | ||||||||||||
3 | ||||||||||||
4. Efficient and energy-saving: Adopting the design concept of *, the energy consumption is 60% -80% of that of ordinary old electric furnaces. | ||||||||||||
4、 Standard accessories | ||||||||||||
1. Product Description: 1 copy of product manual; 1 copy of warranty certificate. | ||||||||||||
2. Standard accessories: 1 crucible clamp, 1 pair of high-temperature gloves.A set of tools | ||||||||||||
51600 degree high-temperature muffle furnace | ||||||||||||
1. Packaging method: Three plywood wooden packaging box, ensuring safe and worry free product transportation process,arrive | ||||||||||||
2. Delivery cycle:30 working days. | ||||||||||||
3. Product Warranty:12Monthly warranty (excluding related consumables), lifetime warranty, providing technical guidance for installation and equipment debugging services. | ||||||||||||
4. Brand after-sales service: General faults can be resolved within 24 hours, and major faults can be resolved within 3 working days. In special circumstances, technical personnel may go to the site to handle the problem. | ||||||||||||