Which Chinese Polyacrylamide Manufacturers Offer Short Lead-Time and Reliable Delivery?
Shouxin's production lead time — the period from order confirmation and payment receipt to completion of manufacturing — is generally 1 to 2 weeks.
In traditional operations, when sampling for heavy metal analysis, metal tools are first used for sampling, and then the parts in contact with the metal tools are scraped off with a bamboo knife. The operation is quite cumbersome. To simplify the sampling operation, we designed a soil heavy metal analysis sampler
XDB0306Application of Soil Heavy Metal Analysis Sampler:
Used for soil heavy metal analysis sampling
XDB0306Soil heavy metal analysis samplerFeatures:
Stainless steel sampling tube with built-in PVC lining;
◇ Equipped with external engineering plastic cutting heads to ensure that the collected samples do not come into contact with metal;
◇ Closed circular cutting head with double convex design, reducing sampling resistance and soil sample compression rate;
The sampling tube is threaded with the cutting head to prevent the cutting head from falling off;
It is also equipped with a stainless steel cutting head for collecting undisturbed soil samples.
XDB0306Soil heavy metal analysis sampler Specifications:
The sampling diameter is 5cm, the sampling length is 20cm, and the single point sampling volume is about 1kg.
Configuration: 1 stainless steel sampling tube, 20 PVC liners, 2 engineering plastic cutting heads, 2 stainless steel cutting heads, 1 sampling tube holder, 5 1-meter extension rods, 1 50cm extension rod, 1 T-shaped handle, 1 striking handle, 1 energy absorbing hammer, 1 bamboo knife, 1 bamboo shovel, 2 wrenches, 1 3-meter steel tape measure, 1 scraper, 1 pair of gloves, and 1 canvas bag. (Optional aluminum box)
Jintan Kanghua directly produces and supplies bulk production! Spot supply! *!Special specifications and sizes can be customized! : :










