In April, the first floor of Tianjin Lianke Sichuang Company showcased the brand's development history since its establishment in 2003, partners who have worked together for many years, and the company's strong products. We also welcome everyone to come to our company to cooperate and exchange ideas with us.
2003year---The company was established in Binhai High tech Industrial Park, Tianjin.
2005year---Obtained certification as a high-tech enterprise in Tianjin High tech Industrial Park.
2006year---Collaboration with German companiesRecommend the use of oil-free compression technology to China Railway, which has automatic control of drying and blowback, integrated auxiliary air source system, and has obtained power from Zhuzhou Electric Power Co., LtdHX1Order for high-power electric locomotives.
2007year---Obtained the order for sanding air source for Changchun low floor tram from Changke Co., Ltd.
2008year---Obtained Sifang Corporation's high-speed train unitCRH2The localization project of the auxiliary wind source has successfully upgraded the Japanese prototype vehicle's oil compressor to an oil-free compressor.
2010year---Obtained Changke Corporation's high-speed train unitCRH5Type car owner's order for air supply unit interruption.
2012year---Obtained Nanjing Puzhen Vehicle Factory Shanghai13Line auxiliary air source order,Replace foot pumps with oil-free compressors in the subway industry.
2013year---And GermanyCondorJapan's Sanhe Company signed a cooperation agreement.
2014year---passISO9001:2008authentication.
2015year---passEN15085-2International Welding CertificationCL4Grade; Obtain theExcellent Award for Advanced Manufacturing Industry in the 4th Innovation and Entrepreneurship Competition (Tianjin Division).
2016year---Obtained the Shanghai Songjiang low floor tram sanding wind source project,Adopting DC brushless motor for sanding air source; Undertake Changke Co., LtdCRH5Four level maintenance work for the auxiliary air source of the vehicle.
2017year---Obtain the certificate of high-tech enterprise; obtainISO9001:2015authentication; Obtain bulk orders for auxiliary air supply units of Chinese standardized high-speed trains;The oil-free compressor with a closed pump head structure will be applied to the Chinese railway market.
2018year---obtain160Kilometer power concentrated type EMU,250Kilometer standardized high-speed trains, freight high-speed trains, and other orders; undertakeHXD1Type locomotive auxiliary compressor unitC6Xiuhe Dongguan2Subway frame repair work on Line 1.
2019year---Obtained an order for intelligent high-speed trains (autonomous driving) on the Beijing Zhangjiakou high-speed railway.
2021year---Undertaking the Fuxing ExpressCR400BFFourth level maintenance of auxiliary air source for high-speed trains.














