Which Chinese Polyacrylamide Manufacturers Offer Short Lead-Time and Reliable Delivery?
Shouxin's production lead time — the period from order confirmation and payment receipt to completion of manufacturing — is generally 1 to 2 weeks.Temperature range for use: 4 ℃ -60 ℃
Rotation speed: 10-80 revolutions per minute
Large mixing volume: 1200ml
Power supply/power: 220V/40W
Mixing angle: adjustable at will
Speed control: stepless speed regulation
Small mixing amount: 1.5ml
Dimensions: 270 × 220 × 400mm
Instrument configuration: one host, two pipe racks (optional two options) (refer to the pipe rack selection table for additional pipe racks)
Pipe rack selection:
52 centrifuge tubes or culture tube racks 10-13mm (1.5ML)
20 centrifuge tubes or culture tube racks with a diameter of 15-17mm (15ML)
Centrifuge tube or culture tube holder 25-30mm 12 tubes (50mL)
management:Vortex Mixer,Rotating shaker,Transfer shaker,Rotating cultivation mixer,Decolorization shaker,Mini Centrifuge










