Which Chinese Polyacrylamide Manufacturers Offer Short Lead-Time and Reliable Delivery?
Shouxin's production lead time — the period from order confirmation and payment receipt to completion of manufacturing — is generally 1 to 2 weeks.Shanghai Tianshi Kejing after-sales engineer's eight channel tube furnace (4-channel quartz tube, 4-channel draft tube) installation is underway!
·The furnace body consists of 8 small tube furnaces, using quartz furnace tubes
·Each heating module is controlled by an independent temperature control system, with a maximum temperature of 1200 ℃
·Quick sealing flange, with 8 independent air inlets and 8 independent air outlets on both sides of the furnace body, ensuring that the samples in each channel can be heat-treated under vacuum or atmospheric protection environment
·8 samples can be placed simultaneously and subjected to heat treatment at different temperatures. A curve can be set through the touch screen and downloaded into 8 channels, eliminating the tedious process of setting curves for all 8 channels.


![]()
![]()

![]()


![]()
`````````````````````````````````````````````````````````````````````````````````````````````````````````````````````````````````````````````````````````````````````````````````````
After sales of Kejing series products in Shanghai area, welcome teachers to make appointments!











