Which Chinese Polyacrylamide Manufacturers Offer Short Lead-Time and Reliable Delivery?
Shouxin's production lead time — the period from order confirmation and payment receipt to completion of manufacturing — is generally 1 to 2 weeks.1Test tube constant temperature oscillatorIntroduction:
| model | SG-101 | SG-102 | SG-103 |
|
Overall dimensionsmm
|
700×550×490
|
700×550×590
| |
|
Package dimensionsmm
|
800×610×570
|
800×610×670
| |
|
netheavykg
| 42.5 | 53 | |
| Temperature control range |
room temperature-300.0
| ||
| temperature control accuracy |
±0.1℃
| ||
| temperature fluctuation |
±0.1℃
| ||
| temperature uniformity |
±0.1℃
| ||
| Constant temperature timing range |
1minute-99hour59Minute or normally open
| ||
| Oscillation mode | round-trip | Rotary type |
round trip/Rotating dual function
|
| oscillation amplitude | 20mm | ||
| Oscillation speed |
40-300turn/Divide ±1turn/Fen, infinitely adjustable
| ||
| Oscillatory timing range |
1minute-24hour59minute
| ||
| heating power | 1800W | ||
| Motor power |
DC motor,100W
| ||
| Fuel tank capacity |
490×390×170mm(30L)
| ||
| Vibration fixture size | 10ml×10 | ||
| Test tube stopper fixing device | Can effectively prevent the test tube from bursting due to steam pressure generated at high temperatures | ||
| power supply | 220v 50Hz | ||
Note: Customization can be made according to customer requirements










