-
E-mail
3903361365@qq.com
-
Phone
18832789820
-
Address
Yuzhan Instrument Equipment (Cangzhou) Co., Ltd
Yuzhan Instrument Equipment (Cangzhou) Co., Ltd
3903361365@qq.com
18832789820
Yuzhan Instrument Equipment (Cangzhou) Co., Ltd
What technical features does the XXG2505L X-ray flaw detector (ceramic orientation) meet? Equipment Introduction (Ceramic Orientation)
Focal length: 600mm
Exposure time: 5 minutes
Blackness: 1.5
Input voltage: 220V ± 10%, 50-60Hz
Output voltage: 150KV-250KV
Power: 2.5Kw
Focus size: 2.0 * 2.0mm
Radiation angle: 40 °+5 °
High penetration power: A3 steel 42mm
Weight: 23Kg
Size: 270 * 270 * 612 (mm)
Working mode: Intermittent work, without cutting off the power supply.
Cooling method: forced air cooling.
Insulation gas: SF6 gas insulation.
Connecting cable: standard 20 meters, can be extended. The cable is 10 meters long.
controller
Slow rise and slow fall: At the beginning of exposure, the primary voltage slowly rises, and after exposure ends, the primary voltage slowly falls.
Delayed exposure: Optional delay time (0.1-9.9 minutes).
Microcomputer control: digital circuit, modular architecture, status prompt.
Weight: 11Kg
Size: 340 * 300 * 140 (mm)
Working voltage: 220V ± 20%, 50Hz
What technical features does the XXG2505L X-ray flaw detector (ceramic orientation) meet? configuration
1. The controller is a handheld touch screen;
2. The plugs for the kilovolt board and milliampere board in the controller are of high quality;
3. The transmission signal line uses imported resistance elements, all of which are components;
4. The controller has two fuses to ensure the safe use and lifespan of the radiation generator;
5. Select domestic cables for connecting cables;
6. Imitation of Japanese Neo Confucianism fastening plugs;
7. The head radiator is made of thermally stretched corrugated aluminum;
8. The fan is a high-speed fan with excellent heat dissipation effect;
9. The high-voltage wire package adopts imported wire and imported nano film;
10. After eight hours of natural cooling under hot vacuum, add insulating gas to the equipment;
11. Before leaving the factory, the equipment shall undergo at least thirty aging tests;
The entire production process strictly follows the quality system standards.