-
E-mail
1379335561@qq.com
-
Phone
15689257565
-
Address
Oulong Technology Park, No.1 Jinma Road, High tech Zone, Weifang City, Shandong Province
Shandong Fengtu IoT Technology Co., Ltd
1379335561@qq.com
15689257565
Oulong Technology Park, No.1 Jinma Road, High tech Zone, Weifang City, Shandong Province

The hydrological monitoring station is a fully automatic hydrological online monitoring system based on microwave technology, which can simultaneously measure water level, flow velocity, flow rate, and rainfall in the channel. It adopts advanced K-band planar radar technology to measure the flow velocity and water level of water bodies in a non-contact manner. According to the built-in software algorithm, it calculates and outputs real-time cross-sectional flow and cumulative flow; Can be used for non-contact flow measurement in rivers, irrigation channels, underground drainage networks, flood prevention warnings, and other occasions; This product has the characteristics of low power consumption, compact size, high reliability, and easy maintenance; The measurement process is not affected by factors such as temperature, sediment, river pollutants, and floating debris on the water surface.
In areas prone to flood disasters, hydrological monitoring stations can provide real-time feedback on the dynamic changes in rainfall and water levels. When a certain warning value is reached, relevant departments can quickly take response measures to ensure the safety of people's lives and property. In areas with water scarcity, long-term monitoring of rainfall and water levels can better plan and manage water resources, ensuring stable and sustainable water supply.
Installation precautions
1. Installation environment
There are no huge stones blocking the water in the test channel section, and there are no phenomena such as huge eddies or turbulence
The testing channel section should be straight, stable, and have concentrated water flow
The test channel section needs to be hardened, and the measurement section should be regular
The testing channel section should be kept smooth to prevent the accumulation of floating debris
2. Installation height
Suggested installation height of 3-4 meters
3. Installation direction of flowmeter
The beam of the flowmeter is recommended to face the incoming water direction