The installation requirements for the power supply of the 100 liter -40 degree cold and hot shock test box are as follows:
1. The equipment requires a 380V power supply and needs to be equipped with at least one 63A residual current switch (one residual current switch is only for one device). The wires need to be 6-square-meter three-phase five wire;
Is the water tower installed on the rooftop or on the first floor?
To be installed in a hard bottomed area.
3. The water supply to the water tower is divided into 4 pipes, with tap water reaching the water tower
Water tower to equipment: 50 pipes
Equipment return tower: 50 pipes
At the same time as laying the water pipes, a 2.5 square 3-core small cable is pulled between the equipment and the water tower to supply power to the water tower. Prepare the required pipeline length based on the actual site conditions
If a water tower cannot be installed. Please provide an environment with air conditioning and industrial exhaust fans for installing the equipment
Air source (compressed air): pressure:>6kg/cm2 Inlet pipe diameter: φ 8mm