Engineering case:A large alkali industry company in Jiangsu110ten thousand tons/Annual Alkali Production PlantSupply and installation of tower internals and packing materials
September 2024Dier Chemical Packing Co., Ltd., Pingxiang City, Jiangxi ProvinceUndertaken by a large alkali industry company in Jiangsu1.1 million tons/year combined alkali production plantofSupply of tower internals and packing materials、The installation work is proceeding in an orderly manner. the projectBy relocating, upgrading, and renovating, we aim to enhance the production capacity and technological level of the enterprise,By our companyProvide a series of services including design, manufacturing, and installation of tower internals.
Among them, the suppliers includeCarbonization tail gas scrubbing tower、Ammonia removal washing tower、Dilute liquid distillation tower、Semi distillation towerWaiting for the grilles, pressure grilles, and trough plates inside the towerGas liquid distributorPacking material. Based on the process characteristics and material properties of the soda ash production unit, suitable types and specifications of fillers were selected. These fillers will be used to improve the mass transfer efficiency inside the tower and ensure the smooth progress of the production process. Packing models include: metal250Y orifice plate corrugated packing, plastic 250Y orifice plate corrugated packing, plastic alloy 250Y orifice plate corrugated packing, plastic ball ring, metal ball ring, ceramic cross ring, etc.
According to the construction progress on site, the installation of tower internals is also being carried out intensively. The installation team carries out the installation of tower internals in an orderly manner based on the design drawings and installation plan, ensuring that each component is accurately in place and meets the process requirements. The supply of fillers is also carried out according to the project schedule to ensure timely delivery. During the installation process, the installation team strictly follows the operating procedures to ensure that the packing can be evenly distributedAchieve good results.
Packing tower internals、Installation is an important step in the installation of chemical equipment and requiresProfessional technicians provide on-site guidance and a professional construction team. Our company has been in operation for more than 20 years and has rich towersEquipmentDesign, supply, and installation experience of internal components and fillers can ensureSupply quality andInstallation quality provides strong guarantee for the normal operation of chemical equipment!
The following are pictures of the customer's on-site installation: